Due-date scheduling on parallel machines with job splitting and sequence-dependent major/minor setup times

被引:25
|
作者
Park, Taeho [1 ]
Lee, Taehyung [1 ]
Kim, Chang Ouk [1 ]
机构
[1] Yonsei Univ, Seoul 120749, South Korea
关键词
Parallel machine scheduling; Due date; Sequence-dependent major/minor setup times; Total tardiness; Job splitting; Heuristics; TARDINESS; PROPERTY; HEURISTICS; ALGORITHM; EARLINESS; COSTS;
D O I
10.1007/s00170-011-3489-x
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
This paper addresses job scheduling problems with parallel machines. To satisfy customers better in a manufacturing company, meeting due dates has been an important performance metric. Besides the numerous other factors affecting due date satisfaction, the splitting of a job through parallel machines can contribute to the reduction of production lead time, resulting in less job tardiness against their due dates. Thus, this paper presents heuristic algorithms for minimizing total tardiness of jobs to meet their due dates in a manufacturing shop with identically functioning machines. The algorithms take into account job splitting and sequence-dependent major/minor setup times. The performance of the proposed heuristics is compared with that of past three algorithms in the literature.
引用
收藏
页码:325 / 333
页数:9
相关论文
共 50 条
  • [11] Scheduling jobs on dynamic parallel machines with sequence-dependent setup times
    Lee, Zne-Jung
    Lin, Shih-Wei
    Ying, Kuo-Ching
    INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2010, 47 (5-8): : 773 - 781
  • [12] A linear programming approach for identical parallel machine scheduling with job splitting and sequence-dependent setup times
    Tahar, DN
    Yalaoui, F
    Chu, CB
    Amodeo, L
    INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 2006, 99 (1-2) : 63 - 73
  • [13] Algorithms for common due-date assignment and sequencing on a single machine with sequence-dependent setup times
    Kim, J-G
    Lee, D-H
    JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 2009, 60 (09) : 1264 - 1272
  • [14] A GENETIC ALGORITHM FOR THE UNRELATED PARALLEL MACHINE SCHEDULING PROBLEM WITH JOB SPLITTING AND SEQUENCE-DEPENDENT SETUP TIMES - LOOM SCHEDULING
    Eroglu, Duygu Yilmaz
    Ozmutlu, H. Cenk
    Koksal, Seyit Ali
    TEKSTIL VE KONFEKSIYON, 2014, 24 (01): : 66 - 73
  • [15] An Exact Approach for the Identical Parallel Machine Scheduling Problem with Sequence-Dependent Setup Times and the Job Splitting Property
    Arbaoui, Taha
    Yalaoui, Farouk
    2016 IEEE INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT (IEEM), 2016, : 721 - 725
  • [17] Scheduling unrelated parallel machines with resource-assignable sequence-dependent setup times
    Rubén Ruiz
    Carlos Andrés-Romano
    The International Journal of Advanced Manufacturing Technology, 2011, 57 : 777 - 794
  • [18] Joint scheduling of parallel machines and AGVs with sequence-dependent setup times in a matrix workshop
    Miao, Ming-Peng
    Sang, Hong-Yan
    Wang, Yu-Ting
    Zhang, Biao
    Tian, Meng-Xi
    COMPUTERS & INDUSTRIAL ENGINEERING, 2023, 185
  • [19] Scheduling unrelated parallel machines with resource-assignable sequence-dependent setup times
    Ruiz, Ruben
    Andres-Romano, Carlos
    INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2011, 57 (5-8): : 777 - 794
  • [20] Scheduling job shop problems with sequence-dependent setup times
    Naderi, B.
    Zandieh, M.
    Ghomi, S. M. T. Fatemi
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2009, 47 (21) : 5959 - 5976