Integrated Distribution Systems Planning to Improve Reliability Under Load Growth

被引:88
|
作者
Ziari, Iman [1 ]
Ledwich, Gerard [1 ]
Ghosh, Arindam [1 ]
Platt, Glenn [2 ]
机构
[1] Queensland Univ Technol, Sch Engn Syst, Brisbane, Qld 4000, Australia
[2] CSIRO Energy Technol, Newcastle, NSW 2304, Australia
基金
澳大利亚研究理事会;
关键词
Distribution system; optimization method; reliability; planning; PARTICLE SWARM OPTIMIZATION; CAPACITOR PLACEMENT; SWITCH PLACEMENT; MULTISTAGE MODEL; GENERATION; POWER; RECONFIGURATION; ALLOCATION; RECLOSERS; ALGORITHM;
D O I
10.1109/TPWRD.2011.2176964
中图分类号
TM [电工技术]; TN [电子技术、通信技术];
学科分类号
0808 ; 0809 ;
摘要
In this paper, an integrated methodology is proposed for planning distribution networks in which the operation of distributed generators (DGs) and cross-connections (CCs) is optimally planned. Distribution lines and high-voltage/medium-voltage (HV/MV) transformers are also optimally upgraded in order to improve system reliability and to minimize line losses under load growth. An objective function is constituted, composed of the investment cost, loss cost, and reliability cost. The energy savings that result from installing DGs is also included in this function. The bus voltage and line current are maintained within their standard bounds as constraints. DG output power is used as another constraint, where this should not be less than 30% of the generator's rated power; otherwise, the unit is not switched on. The modified discrete particle swarm optimization (PSO) method is employed in this paper for optimizing this planning problem. To evaluate the proposed approach, the distribution system connected to bus 4 of the Roy Billinton test system is used. Four different scenarios are assessed. In the first scenario, a basic planning approach is studied. In the second scenario, the use of DG is planned to avoid the line and transformer upgrading. In the third scenario, CC-based planning is studied when no DG exists. Finally, the proposed technique, in which all technologies are included, is investigated in the fourth scenario. The outcomes demonstrate that the lowest cost plan results when all technologies are incorporated as proposed in this paper. A study is performed to evaluate the accuracy and robustness of the proposed PSO-based optimization method. The results highlight the applicability of this method for solving the distribution network planning problem.
引用
收藏
页码:757 / 765
页数:9
相关论文
共 50 条
  • [31] Integrated Transmission and Distribution System Expansion Planning Under Uncertainty
    Munoz-Delgado, Gregorio
    Contreras, Javier
    Arroyo, Jose M.
    de la Nieta, Agustin Sanchez
    Gibescu, Madeleine
    2023 IEEE POWER & ENERGY SOCIETY GENERAL MEETING, PESGM, 2023,
  • [32] Integrated Transmission and Distribution System Expansion Planning Under Uncertainty
    Munoz-Delgado, Gregorio
    Contreras, Javier
    Arroyo, Jose M.
    Sanchez de la Nieta, Agustin
    Gibescu, Madeleine
    IEEE TRANSACTIONS ON SMART GRID, 2021, 12 (05) : 4113 - 4125
  • [33] An analysis of distribution planning under a regulatory regime: An integrated framework
    Verma, Aprajay
    Swarup, K Shanti
    Energy Conversion and Economics, 2023, 4 (03): : 179 - 201
  • [34] Integrated reliability centered distribution system planning - Cable routing and switch placement
    Zarkovic, Sanja Duvnjak
    Shayesteh, Ebrahim
    Hilber, Patrik
    ENERGY REPORTS, 2021, 7 : 3099 - 3115
  • [35] Two efficient heuristics to solve the integrated load distribution and production planning problem
    Gajpal, Yuvraj
    Nourelfath, Mustapha
    RELIABILITY ENGINEERING & SYSTEM SAFETY, 2015, 144 : 204 - 214
  • [36] Integrated planning of distributed generation sources and networks in distribution systems
    Chen Hai-yan
    Cen Jin-fu
    Duan Xian-zhong
    PROCEEDINGS OF THE 41ST INTERNATIONAL UNIVERSITIES POWER ENGINEERING CONFERENCE, VOLS 1 AND 2, 2006, : 207 - 211
  • [37] Reliability Evaluation and Maintenance Planning for Systems With Load-Sharing Auxiliary Components
    Cai, Xiayu
    Shen, Jingyuan
    Shen, Lijuan
    IEEE TRANSACTIONS ON RELIABILITY, 2023, 72 (03) : 950 - 963
  • [38] Reliability Evaluation of Smart Distribution Systems Considering Load Rebound Characteristics
    Li, Gengfeng
    Huang, Yuxiong
    Bie, Zhaohong
    IEEE TRANSACTIONS ON SUSTAINABLE ENERGY, 2018, 9 (04) : 1713 - 1721
  • [39] Multistage distribution substations planning considering reliability and growth of energy demand
    Esmaeeli, M.
    Kazemi, A.
    Shayanfar, H. A.
    Haghifam, M. -R.
    ENERGY, 2015, 84 : 357 - 364
  • [40] Planning Method for Distribution Networks Based on Load Growth Characteristics of the Industry
    Kong Lin
    Xiao Jing
    Zhou Hengjun
    Wang Beibei
    2016 CHINA INTERNATIONAL CONFERENCE ON ELECTRICITY DISTRIBUTION (CICED), 2016,