Integrated Distribution Systems Planning to Improve Reliability Under Load Growth

被引:88
|
作者
Ziari, Iman [1 ]
Ledwich, Gerard [1 ]
Ghosh, Arindam [1 ]
Platt, Glenn [2 ]
机构
[1] Queensland Univ Technol, Sch Engn Syst, Brisbane, Qld 4000, Australia
[2] CSIRO Energy Technol, Newcastle, NSW 2304, Australia
基金
澳大利亚研究理事会;
关键词
Distribution system; optimization method; reliability; planning; PARTICLE SWARM OPTIMIZATION; CAPACITOR PLACEMENT; SWITCH PLACEMENT; MULTISTAGE MODEL; GENERATION; POWER; RECONFIGURATION; ALLOCATION; RECLOSERS; ALGORITHM;
D O I
10.1109/TPWRD.2011.2176964
中图分类号
TM [电工技术]; TN [电子技术、通信技术];
学科分类号
0808 ; 0809 ;
摘要
In this paper, an integrated methodology is proposed for planning distribution networks in which the operation of distributed generators (DGs) and cross-connections (CCs) is optimally planned. Distribution lines and high-voltage/medium-voltage (HV/MV) transformers are also optimally upgraded in order to improve system reliability and to minimize line losses under load growth. An objective function is constituted, composed of the investment cost, loss cost, and reliability cost. The energy savings that result from installing DGs is also included in this function. The bus voltage and line current are maintained within their standard bounds as constraints. DG output power is used as another constraint, where this should not be less than 30% of the generator's rated power; otherwise, the unit is not switched on. The modified discrete particle swarm optimization (PSO) method is employed in this paper for optimizing this planning problem. To evaluate the proposed approach, the distribution system connected to bus 4 of the Roy Billinton test system is used. Four different scenarios are assessed. In the first scenario, a basic planning approach is studied. In the second scenario, the use of DG is planned to avoid the line and transformer upgrading. In the third scenario, CC-based planning is studied when no DG exists. Finally, the proposed technique, in which all technologies are included, is investigated in the fourth scenario. The outcomes demonstrate that the lowest cost plan results when all technologies are incorporated as proposed in this paper. A study is performed to evaluate the accuracy and robustness of the proposed PSO-based optimization method. The results highlight the applicability of this method for solving the distribution network planning problem.
引用
收藏
页码:757 / 765
页数:9
相关论文
共 50 条
  • [1] Optimal Placement of the Distribution Substations to Improve Reliability Under Load Growth
    Haghifam, M-R
    Esmaeeli, M.
    Kazemi, A.
    Shayanfar, H.
    2015 IEEE POWER & ENERGY SOCIETY GENERAL MEETING, 2015,
  • [2] Load shedding schemes of under frequency relay to improve reliability in power systems
    Kim, Kyu-Ho
    Song, Kyung-Bin
    Kim, Il-Dong
    Yang, Jeong-Jae
    Cho, Beom-Seob
    Transactions of the Korean Institute of Electrical Engineers, 2010, 59 (07): : 1214 - 1220
  • [3] Optimal robust integrated power distribution network planning under load demand uncertainty
    Hosseinian, Seyed Hossein (hosseinian@aut.ac.ir), 2016, Warsaw University of Technology (96):
  • [4] Optimal robust integrated power distribution network planning under load demand uncertainty
    Gholizadeh-Roshanagh, Reza
    Najafi-Ravadanegh, Sajad
    Hosseinian, Seyed Hossein
    JOURNAL OF POWER TECHNOLOGIES, 2016, 96 (02): : 115 - 123
  • [5] Energy Storage to Improve Reliability of Wind Integrated Systems Under Frequency Security Constraint
    Nguyen, Nga
    Bera, Atri
    Mitra, Joydeep
    IEEE TRANSACTIONS ON INDUSTRY APPLICATIONS, 2018, 54 (05) : 4039 - 4047
  • [6] Energy Storage to Improve Reliability of Wind Integrated Systems under Frequency Security Constraint
    Nga Nguyen
    Bera, Atri
    Mitra, Joydeep
    2017 IEEE INDUSTRY APPLICATIONS SOCIETY ANNUAL MEETING, 2017,
  • [7] Planning and design for continuity and reliability in distribution systems
    Geering, F.
    Lohner, E.
    Tuhovcak, L.
    Liimatainen, J.
    Saarikoski, K.
    Bost, J.-F.
    Hirner, W.
    Chan, P.W.
    Druisani, R.
    Spokas, R.
    Lai, Cheng Cheong
    Zerouali, A.
    Dane, P.A.
    Hoogsteen, K.J.
    van den Hoven, Th.J.J.
    Water Supply, 1996, 14 (3-4): : 75 - 82
  • [8] INTEGRATED MANAGEMENT-SYSTEMS IMPROVE PLANT RELIABILITY
    SUTTON, IS
    HYDROCARBON PROCESSING, 1995, 74 (01): : 63 - 66
  • [9] Reliability Growth Test Planning of Repairable Systems Using Subsystem Failure Distribution Data
    Awad, Mahmoud
    2015 INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND SYSTEMS MANAGEMENT (IESM), 2015, : 155 - 160
  • [10] PLANNING LARGE SYSTEMS RELIABILITY GROWTH TESTS
    SMITH, DK
    PROCEEDINGS ANNUAL RELIABILITY AND MAINTAINABILITY SYMPOSIUM, 1984, (NSYM): : 471 - 475