Critical Project Management Factors of AEC Firms for Delivering Green Building Projects in Singapore

被引:125
|
作者
Li, Yuan Yuan [1 ]
Chen, Po-Han
Chew, David Ah Seng [1 ]
Teo, Chee Chong [1 ]
Ding, Rong Gui [2 ]
机构
[1] Nanyang Technol Univ, Sch Civil & Environm Engn, Singapore 639798, Singapore
[2] Shandong Univ, Sch Management, Jinan 250100, Shandong, Peoples R China
关键词
Critical project management factors; Green building; Green Mark; Construction industry; Principal component factor analysis; Multiple regression; CRITICAL SUCCESS FACTORS; URBAN CONSTRUCTION; PERFORMANCE; DESIGN; IMPACT;
D O I
10.1061/(ASCE)CO.1943-7862.0000370
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
In recent years, greater environmental awareness had induced the managers of building projects to "go green," and several studies have been conducted on the project delivery of green building. However, there is no comprehensive study that explores the important project management factors from the perspective of architectural, engineering, and construction (AEC) firms, whose decisions can significantly affect the environmental performance of building projects. In Singapore, Green Mark, a certification for green building, has become a compulsory requirement for all new buildings. AEC firms are now facing challenges on how best to attain Green Mark certification with minimum cost and resources. The purpose of this research is to identify the controllable critical project management factors for delivering Green Mark certified projects to achieve higher Green Mark ratings. Nineteen controllable project management factors were first identified from related literature, and then a survey was carried out to collect data needed to perform the principal component factor analysis. The factor analysis revealed that the controllable project management factors could be grouped into five major components, namely, (1) human resource-oriented factors, (2) technical and innovation-oriented factors, (3) support from designers and senior management, (4) project manager's competence, and (5) coordination of designers and contractors. Finally, multiple regression analysis was applied. It was found that the coordination of designers and contractors and technical and innovation-oriented factors are the most critical success factors, and possible reasons are discussed. With the help of the research findings, project organizations in Singapore will manage their Green Mark certified projects to achieve higher rating levels in a more efficient and effective way. DOI: 10.1061/(ASCE)CO.1943-7862.0000370. (C) 2011 American Society of Civil Engineers.
引用
收藏
页码:1153 / 1163
页数:11
相关论文
共 50 条
  • [21] Soft cost elements: Exploring management components of project costs in green building projects
    Abidin, Nazirah Zainul
    Azizi, Nurul Zahirah Mokhtar
    Environmental Impact Assessment Review, 2021, 87
  • [22] Soft cost elements: Exploring management components of project costs in green building projects
    Abidin, Nazirah Zainul
    Azizi, Nurul Zahirah Mokhtar
    ENVIRONMENTAL IMPACT ASSESSMENT REVIEW, 2021, 87
  • [23] Exploring critical risk factors for Green Building projects in developing countries: The case of Vietnam
    Nguyen, Hung Duy
    Macchion, Laura
    JOURNAL OF CLEANER PRODUCTION, 2022, 381
  • [24] Critical Success Factors of the Project Management in Relation to Industry 4.0 for Sustainability of Projects
    Vrchota, Jaroslav
    Rehor, Petr
    Marikova, Monika
    Pech, Martin
    SUSTAINABILITY, 2021, 13 (01) : 1 - 19
  • [25] Critical Success Factors of Project Management : The Case of Construction Related Projects in Vietnam
    Viet Quoc Pham
    Bao Khac Quoc Nguyen
    Binh Van Tu
    Huong Thi Thanh Pham
    Thanh Quoc Le
    JOURNAL OF ASIAN FINANCE ECONOMICS AND BUSINESS, 2019, 6 (02): : 223 - 230
  • [26] Green Building Construction Projects in Singapore: Cost Premiums and Cost Performance
    Hwang, Bon-Gang
    Zhu, Lei
    Wang, Yinglin
    Cheong, Xinyi
    PROJECT MANAGEMENT JOURNAL, 2017, 48 (04) : 67 - 79
  • [27] Strategic safety management information system for building projects in Singapore
    Kamardeen, Imriyas
    ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2009, 16 (01) : 8 - 25
  • [28] Value Management in Singaporean Building Projects: Implementation Status, Critical Success Factors, and Risk Factors
    Hwang, Bon-Gang
    Zhao, Xianbo
    Ong, Shi Ying
    JOURNAL OF MANAGEMENT IN ENGINEERING, 2015, 31 (06)
  • [29] Models for Predicting Project Performance in China Using Project Management Practices Adopted by Foreign AEC Firms
    Ling, Florence Yean Yng
    Low, Sui Pheng
    Wang, ShouQing
    Egbelakin, Temitope
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2008, 134 (12) : 983 - 990
  • [30] Analyzing relationships between project team compositions and green building certification in green building projects
    Cheng, Jack C. P.
    Venkataraman, Vignesh
    BUILT ENVIRONMENT PROJECT AND ASSET MANAGEMENT, 2016, 6 (05) : 449 - 461