Critical Project Management Factors of AEC Firms for Delivering Green Building Projects in Singapore

被引:125
|
作者
Li, Yuan Yuan [1 ]
Chen, Po-Han
Chew, David Ah Seng [1 ]
Teo, Chee Chong [1 ]
Ding, Rong Gui [2 ]
机构
[1] Nanyang Technol Univ, Sch Civil & Environm Engn, Singapore 639798, Singapore
[2] Shandong Univ, Sch Management, Jinan 250100, Shandong, Peoples R China
关键词
Critical project management factors; Green building; Green Mark; Construction industry; Principal component factor analysis; Multiple regression; CRITICAL SUCCESS FACTORS; URBAN CONSTRUCTION; PERFORMANCE; DESIGN; IMPACT;
D O I
10.1061/(ASCE)CO.1943-7862.0000370
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
In recent years, greater environmental awareness had induced the managers of building projects to "go green," and several studies have been conducted on the project delivery of green building. However, there is no comprehensive study that explores the important project management factors from the perspective of architectural, engineering, and construction (AEC) firms, whose decisions can significantly affect the environmental performance of building projects. In Singapore, Green Mark, a certification for green building, has become a compulsory requirement for all new buildings. AEC firms are now facing challenges on how best to attain Green Mark certification with minimum cost and resources. The purpose of this research is to identify the controllable critical project management factors for delivering Green Mark certified projects to achieve higher Green Mark ratings. Nineteen controllable project management factors were first identified from related literature, and then a survey was carried out to collect data needed to perform the principal component factor analysis. The factor analysis revealed that the controllable project management factors could be grouped into five major components, namely, (1) human resource-oriented factors, (2) technical and innovation-oriented factors, (3) support from designers and senior management, (4) project manager's competence, and (5) coordination of designers and contractors. Finally, multiple regression analysis was applied. It was found that the coordination of designers and contractors and technical and innovation-oriented factors are the most critical success factors, and possible reasons are discussed. With the help of the research findings, project organizations in Singapore will manage their Green Mark certified projects to achieve higher rating levels in a more efficient and effective way. DOI: 10.1061/(ASCE)CO.1943-7862.0000370. (C) 2011 American Society of Civil Engineers.
引用
收藏
页码:1153 / 1163
页数:11
相关论文
共 50 条
  • [1] EXPLORATION OF CRITICAL EXTERNAL PARTNERS OF ARCHITECTURE/ENGINEERING/CONSTRUCTION (AEC) FIRMS FOR DELIVERING GREEN BUILDING PROJECTS IN SINGAPORE
    Li, Yuan Yuan
    Chen, Po-Han
    Chew, David Ah Seng
    Teo, Chee Chong
    Ding, Rong Gui
    JOURNAL OF GREEN BUILDING, 2012, 7 (03): : 193 - 209
  • [2] Exploration of critical resources and capabilities of design firms for delivering green building projects: Empirical studies in Singapore
    Li, Yuan Yuan
    Chen, Po-Han
    Chew, David Ah Seng
    Teo, Chee Chong
    HABITAT INTERNATIONAL, 2014, 41 : 229 - 235
  • [3] Project Management Factors Affecting Green Building Projects: Case Study of Singapore
    Li, Yuanyuan
    Chen, Po-Han
    Chew, David Ah Seng
    Teo, Chee Chong
    Xu, Youquan
    ARCHITECTURE, BUILDING MATERIALS AND ENGINEERING MANAGEMENT, PTS 1-4, 2013, 357-360 : 2346 - +
  • [4] Project Owners' Motivation for Delivering Green Building Projects
    Olanipekun, Ayokunle Olubunmi
    Xia, Bo
    Hon, Carol
    Hu, Yi
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2017, 143 (09)
  • [5] Green commercial building projects in Singapore: Critical risk factors and mitigation measures
    Hwang, Bon-gang
    Shan, Ming
    Supa'at, Nur Nadiah Binte
    SUSTAINABLE CITIES AND SOCIETY, 2017, 30 : 237 - 256
  • [6] Diffusion of Building Information Modeling in Building Projects and Firms in Singapore
    Liao, Longhui
    Teo, Evelyn Ai Lin
    Chang, Ruidong
    Zhao, Xianbo
    SUSTAINABILITY, 2020, 12 (18)
  • [7] Factors Affecting Productivity in Green Building Construction Projects: The Case of Singapore
    Hwang, Bon-Gang
    Zhu, Lei
    Ming, Jonathan Tan Tzu
    JOURNAL OF MANAGEMENT IN ENGINEERING, 2017, 33 (03)
  • [8] CRITICAL SUCCESS FACTORS FOR ENHANCING THE BUILDING INFORMATION MODELLING IMPLEMENTATION IN BUILDING PROJECTS IN SINGAPORE
    Liao, Longhui
    Teo, Evelyn Ai Lin
    JOURNAL OF CIVIL ENGINEERING AND MANAGEMENT, 2017, 23 (08) : 1029 - 1044
  • [9] Identifying critical leadership styles of project managers for green building projects
    Zhao, Xianbo
    Hwang, Bon-Gang
    Lee, Hong Ning
    INTERNATIONAL JOURNAL OF CONSTRUCTION MANAGEMENT, 2016, 16 (02) : 150 - 160
  • [10] Review of Critical Success Factors (CSFs) for green building projects
    Li, Yuanyuan
    Song, Huanbin
    Sang, Peidong
    Chen, Po-Han
    Liu, Xingmin
    BUILDING AND ENVIRONMENT, 2019, 158 : 182 - 191