Time-based modifications to process theory illustrations through a corporate rebranding case study

被引:2
|
作者
Juntunen, Mari [1 ]
机构
[1] Univ Oulu, Oulu Business Sch, Dept Mkt, Oulu, Finland
关键词
Corporate rebranding; Organizational change; Corporate branding; Lifecycle; Small and medium sized enterprises; Teleology; ORGANIZATIONAL-CHANGE; FIRM;
D O I
10.1108/BJM-01-2014-0014
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
Purpose - The purpose of this paper is to develop the lifecycle and teleology process theory illustrations by uniting processes and their outcomes based on their being bounded in time. Design/methodology/approach - The study combines objective and subjective ontological approaches to organisational development and change processes. The narrative data of corporate rebranding among small B2B companies were gathered through a multiple case study and analysed in relation to flow of time. The illustrations of teleology and lifecycle process theory are modified based on empirical data. Findings - The underlying logic of the lifecycle and teleology illustrations is found to be the same. The historical processes follow the logic of the lifecycle processes and emphasise the outcomes; the lifecycle process theory illustration is modified by adding outcomes. The current processes are in line with the literal description of the teleology. Teleology processes are illustrated using double-headed arrows between all processes. Research limitations/implications - Employing the objective and subjective ontological view in the same study might be questioned. The modifications to the process theory illustrations are only one view on the issue and the study does not take a stand on how the imagined future processes might be described. Practical implications - The study helps researchers and managers better understand the lifecycle and teleology process theory and the role of outcomes in process research. The study should encourage researchers and managers to incorporate the role of process outcomes into their future (business) planning more efficiently, and combine different ontological views. Originality/value - The study is a rare attempt to develop process theory illustrations.
引用
收藏
页码:222 / 242
页数:21
相关论文
共 50 条
  • [21] The study of time-based consolidation replenishment for VMI
    Zhang Nan
    Wei Lingyun
    PROCEEDINGS OF THE 4TH CONFERENCE ON SYSTEMS SCIENCE, MANAGEMENT SCIENCE AND SYSTEMS DYNAMICS, SSMSSD10, VOL 5, 2011, : 155 - 162
  • [22] A time-based process model of international entrepreneurial opportunity evaluation
    Yanto Chandra
    Journal of International Business Studies, 2017, 48 : 423 - 451
  • [23] Nation Rebranding Through a New Approach to Cultural Diplomacy: A Case Study of Mauritius
    Pudaruth, Santosh Kumar
    SAGE OPEN, 2017, 7 (02):
  • [24] A time-based process model of international entrepreneurial opportunity evaluation
    Chandra, Yanto
    JOURNAL OF INTERNATIONAL BUSINESS STUDIES, 2017, 48 (04) : 423 - 451
  • [25] A MATHEMATICAL MODEL FOR PROCESS CYCLE TIME - THEORY AND CASE STUDY
    Tosenovsky, Filip
    QUALITY INNOVATION PROSPERITY-KVALITA INOVACIA PROSPERITA, 2010, 14 (1-2): : 64 - 71
  • [26] Time-based analysis of total cost of patient episodes A case study of hip replacement
    Peltokorpi, Antti
    Kujala, Jaakko
    INTERNATIONAL JOURNAL OF HEALTH CARE QUALITY ASSURANCE, 2006, 19 (02) : 136 - +
  • [27] The impact of Australian healthcare reforms on emergency department time-based process outcomes: An interrupted time series study
    Prang, Khic-Houy
    Canaway, Rachel
    Bismark, Marie
    Dunt, David
    Kelaher, Margaret
    PLOS ONE, 2018, 13 (12):
  • [28] Ease of product assembly through a time-based design methodology
    Desai, Anoop
    ASSEMBLY AUTOMATION, 2019, 39 (05) : 881 - 903
  • [29] TEXT CLASSIFICATION THROUGH TIME Efficient Label Propagation in Time-Based Graphs
    Baluja, Shumeet
    Ravichandran, Deepak
    Sivakumar, D.
    KDIR 2009: PROCEEDINGS OF THE INTERNATIONAL CONFERENCE ON KNOWLEDGE DISCOVERY AND INFORMATION RETRIEVAL, 2009, : 174 - 182
  • [30] A comparative study of the time-based and activity-based approaches to multipurpose multistage batch process production scheduling
    Das, BP
    Shah, N
    Chung, PWH
    Huang, W
    PRES '99: 2ND CONFERENCE ON PROCESS INTEGRATION, MODELLING AND OPTIMISATION FOR ENERGY SAVING AND POLLUTION REDUCTION, 1999, : 229 - 234