Office Automation Sub-Summary of the Work and the Project Management System

被引:0
|
作者
Li, Biqing [1 ]
Li, Zhao [2 ]
机构
[1] Hezhou Univ, Coll Mech & Elect Engn, Hezhou 542899, Guangxi, Peoples R China
[2] Guangxi Vocat & Tech Coll Commun, Management Engn Dept, Liuzhou 545000, Guangxi, Peoples R China
关键词
Microsoft Visual 2010; Microsoft SQL Server2005; Office automation; OA; B/S model; ASP.NET;
D O I
暂无
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
This paper uses the interview object thought to analyze some of the core technology, telling the office automation development process, operation process and system. This paper mainly research on the office automation system (OA) function as the foundation, uses current more popular B/S (Browser / server) structure and ASP.NET technology development, the use of Windows 7, Microsoft Visual 2010 and Microsoft database, SQL Server2005 as the development platform, design and develop a more perfect OA system. By analyzing the system of a series of needs analysis, outline design, detailed design, coding, testing, software delivery, acceptance of the operation, the system has realized the summary of the work and project management 2 functional modules. Friendly interface, easy to operate, as long as the master of the Windows operating system and Web simple operation, can basically use the system.
引用
收藏
页码:346 / 348
页数:3
相关论文
共 50 条
  • [31] OPAS - AN OFFICE PROCEDURE AUTOMATION SYSTEM
    LUM, VY
    CHOY, DM
    SHU, NC
    IBM SYSTEMS JOURNAL, 1982, 21 (03) : 327 - 350
  • [32] HOME AND OFFICE AUTOMATION SYSTEM - SURVEY
    Gobinath, V
    Gladence, Mary L.
    Haran, Hari S.
    Sathiyavathi, R.
    Anu, Maria, V
    2017 THIRD INTERNATIONAL CONFERENCE ON SCIENCE TECHNOLOGY ENGINEERING & MANAGEMENT (ICONSTEM), 2017, : 435 - 440
  • [33] PRIMES OFFICE AUTOMATION SYSTEM (OAS)
    RANKIN, C
    OFFICEMATION PRODUCT REPORTS, 1985, 8 (10): : 8 - 24
  • [34] The project office -: Facilitating parallel project management
    Ragnarsdottir, Heiorun Gigja
    PROCEEDINGS OF NORDDESIGN 2006 CONFERENCE, 2006, : 128 - 130
  • [35] STAKEHOLDER MANAGEMENT AND PROJECT MANAGEMENT OFFICE: EFFECT ON PROJECT RESULTS
    Rabechini, Roque, Jr.
    Alberto Morris Abarca, Eddy
    Salcedo, Nestor U.
    P. Horna Saldana, Cesar Jhonnatan
    Paiva, Danielle Cruz
    RAE-REVISTA DE ADMINISTRACAO DE EMPRESAS, 2022, 62 (06):
  • [36] OFFICE AUTOMATION - ITS IMPACT ON THE WAY WE WORK
    MCDOWELL, RL
    CLINICAL CHEMISTRY, 1985, 31 (06) : 892 - 892
  • [37] Accelerate the Library Management and the Construction of Office Automation
    Xing Yanqiu
    Wang Huiqiang
    PROCEEDINGS OF 2008 INTERNATIONAL SEMINAR ON EDUCATION MANAGEMENT AND ENGINEERING, 2008, : 890 - 893
  • [38] Project Management Phases of a SCADA System for Automation of Electrical Distribution Networks
    Lakhoua, Mohamed Najeh
    Jbira, Mohamed Kamel
    International Journal of Computer Science Issues, 2012, 9 (2 2-2): : 157 - 162
  • [39] Project Management Office for Program and Portfolio Management
    Rehacek, Petr
    INNOVATION MANAGEMENT AND SUSTAINABLE ECONOMIC COMPETITIVE ADVANTAGE: FROM REGIONAL DEVELOPMENT TO GLOBAL GROWTH, VOLS I - VI, 2015, 2015, : 352 - 358
  • [40] A public project management office's contribution to result managing system
    Pinheiro, Marcelo Torres
    da Silva Rocha, Monica Aparecida
    REVISTA DO SERVICO PUBLICO, 2012, 63 (02): : 199 - 215