Evaluating the Failure Risk Level of an Enterprise Resource Planning Project Using Analytic Network Process in Fuzzy Environment

被引:0
|
作者
Kop, Yesim [1 ]
Ulukan, H. Ziya [1 ]
Gurbuz, Tuncay [1 ]
机构
[1] Galatasaray Univ, Dept Ind Engn, TR-34357 Istanbul, Turkey
关键词
ERP implementation; analytic network process; dependency; fuzzy; risk evaluation; CRITICAL SUCCESS FACTORS; SUPPLIER SELECTION; ERP; IMPLEMENTATION; MANAGEMENT; MODEL; FRAMEWORK;
D O I
暂无
中图分类号
TP18 [人工智能理论];
学科分类号
081104 ; 0812 ; 0835 ; 1405 ;
摘要
In today's world of competition, effective and on time information and efficient decisions are indispensable aspects of the management. Enterprise Resource Planning systems are information systems that ensure an effective and efficient management by providing cooperative data flow, handling and planning all process. ERP projects represent a major investment but their failure rates are very high. They are risky projects. Six main risk factors considered in this study are: Executive risks, Organizational risks, Project management risks, Technical risks, Decision making risks, Functional risks. Having "evaluation of the failure risk of a SAP/R3 implementation project" as the main objective, possible inter and inner relationships/dependencies between the main factors are considered and an Analytic Network Process approach is proposed to the model. Decision makers usually are unable to be explicit about their preferences due to the fuzzy nature of the comparison process. So, expert judgments are matched with fuzzy numbers, in this study.
引用
收藏
页码:407 / 423
页数:17
相关论文
共 50 条
  • [41] Project Portfolio Resource Risk Assessment considering Project Interdependency by the Fuzzy Bayesian Network
    Bai, Libiao
    Zhang, Kaimin
    Shi, Huijing
    An, Min
    Han, Xiao
    COMPLEXITY, 2020, 2020
  • [42] Power Transmission and Transformation Project Using Analytic Network Process
    Huang Yue-hua
    GREEN POWER, MATERIALS AND MANUFACTURING TECHNOLOGY AND APPLICATIONS II, 2012, 214 : 430 - 435
  • [43] PRIORITIZATION OF TOURISM TYPES USING FUZZY ANALYTIC NETWORK PROCESS
    Demirel, Tufan
    Demirel, Nihan Cetin
    Ozdemir, Yavuz
    INTELLIGENT DECISION MAKING SYSTEMS, VOL. 2, 2010, : 514 - +
  • [44] Study on Software Project Risk Assessment based on Fuzzy Analytic Hierarchy Process
    Meng, Yu-qiao
    2017 IEEE 3RD INFORMATION TECHNOLOGY AND MECHATRONICS ENGINEERING CONFERENCE (ITOEC), 2017, : 853 - 857
  • [45] Evaluating the Best of Knowledge Management Technology for Small Medium Enterprise Based on Fuzzy Analytic Hierarchy Process
    Hamundu, Ferdinand Murni
    Siregar, Lelyzar
    Budiarto, Rahmat
    2009 THIRD ASIA INTERNATIONAL CONFERENCE ON MODELLING & SIMULATION, VOLS 1 AND 2, 2009, : 200 - 205
  • [46] Resource Allocation of Cooperative Alternatives Using the Analytic Hierarchy Process and Analytic Network Process with Shapley Values
    Huang, Jih-Jeng
    Chen, Chin-Yi
    ALGORITHMS, 2024, 17 (04)
  • [47] Process modeling and simulation for multi-level network project planning
    Qiao, Lihong
    Kao, Shuting
    Wang, Chao
    Jixie Gongcheng Xuebao/Journal of Mechanical Engineering, 2011, 47 (10): : 152 - 156
  • [48] A Method for Planning Wireless Terminal Access Network Based on Fuzzy Analytic Hierarchy Process
    Lin, Hongyang
    Xia, Bingsen
    Zhang, Fenfen
    He, Yanhua
    PROCEEDINGS OF 2019 IEEE 3RD INFORMATION TECHNOLOGY, NETWORKING, ELECTRONIC AND AUTOMATION CONTROL CONFERENCE (ITNEC 2019), 2019, : 565 - 568
  • [49] Managing project risk using combined analytic hierarchy process and risk map
    Dey, Prasanta Kumar
    APPLIED SOFT COMPUTING, 2010, 10 (04) : 990 - 1000
  • [50] Study on Operation Risk Assessment of Electric Power Enterprise based on Fuzzy Analytic Hierarchy Process
    Zhong, Fusen
    Jia, Chuanliang
    Liu, Shiming
    Tan, Jiali
    PROCEEDINGS OF THE 4TH INTERNATIONAL CONFERENCE ON MECHATRONICS, MATERIALS, CHEMISTRY AND COMPUTER ENGINEERING 2015 (ICMMCCE 2015), 2015, 39 : 1637 - 1642