TYPES, CAUSES, AND EFFECTS OF DEFECTIVE CONSTRUCTION WORKS

被引:0
|
作者
Jareanvanun, Pornsak [1 ]
Sutheerawatthana, Pitch [2 ]
机构
[1] King Mongkuts Univ Technol, Facil Off, Bangkok, Thailand
[2] King Mongkuts Univ Technol, Dept Civil Engn, Bangkok, Thailand
关键词
Continues Improvement; Defect; Delay; Risk; Sustainable Solution;
D O I
暂无
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
Reviews of performance after construction completion is an important task for enhancing the sustainability of engineering solutions for social needs. This research reviewed and investigated defects in some construction projects of a university. The article analyzed types, causes, and effects of defects in terms of both time and cost dimensions. It collected data through the investigation of how completion certificates and contract documents are issued. It also gathered information on the causes of defects by interviewing project supervisors and those involved projects. The result showed that the majority of defects were in the architectural work, accounting for 57.1% of the total. The chance of having defects depends on the type of project. The main causes were foremen, workers, and working procedures. In the defective projects, defects caused delay in obtaining payment, averaging approximately 26 days. Defects also caused cost increases, averaging 3.3% of the initial contract value. These findings are vital for the construction department of the university to continuously improve and find more sustainable solutions in monitoring and supervising construction projects, so that fewer defects occur.
引用
收藏
页码:513 / 518
页数:6
相关论文
共 50 条
  • [21] MANAGEMENT OF DEFECTIVE WORKS IN INFRASTRUCTURE PROJECTS
    Gashi, Esat
    ROAD AND RAIL INFRASTRUCTURE V, 2018, : 1435 - 1443
  • [22] THE CAUSES OF DELINQUENCY IN MENTALLY DEFECTIVE BOYS
    Montague, Helen
    PROCEEDINGS AND ADDRESSES OF THE ANNUAL SESSION-AMERICAN ASSOCIATION FOR THE STUDY OF THE FEEBLE-MINDED, 1930, 35 : 104 - 113
  • [23] Types and causes of otorrhea
    Bardanis, J
    Batzakakis, D
    Mamatas, S
    AURIS NASUS LARYNX, 2003, 30 (03) : 253 - 257
  • [24] Types and causes of otorrhea
    Bardanis, J
    Mamatas, S
    4TH EUROPEAN CONGRESS OF OTO-RHINO-LARYNGOLOGY HEAD AND NECK SURGERY, VOLS 1 AND 2, 2000, : 929 - 933
  • [25] Assessing the Causes and Effects of Delay and Disruption in Construction Projects in Malaysia
    Sohu, S.
    Kassim, Tahara Ramadzan Binti Md
    Mustafa, A.
    Arshad, M. U.
    Nagapan, S.
    JOURNAL OF APPLIED ENGINEERING SCIENCES, 2024, 14 (02) : 336 - 341
  • [26] Analyzing Delays of Road Construction Projects in Cambodia: Causes and Effects
    San Santoso, Djoen
    Soeng, Sothy
    JOURNAL OF MANAGEMENT IN ENGINEERING, 2016, 32 (06)
  • [27] CAUSES AND EFFECTS OF POOR COMMUNICATION IN THE CONSTRUCTION INDUSTRY IN THE MENA REGION
    Suleiman, Akram
    JOURNAL OF CIVIL ENGINEERING AND MANAGEMENT, 2022, 28 (05) : 365 - 376
  • [28] EDUCATIONAL TYPES OF MENTALLY DEFECTIVE CHILDREN
    HILLIAD, LT
    JOURNAL OF MENTAL SCIENCE, 1949, 95 (401): : 860 - 866
  • [29] DELINQUENT TYPES OF MENTALLY DEFECTIVE PERSONS
    MILNER, KO
    JOURNAL OF MENTAL SCIENCE, 1949, 95 (401): : 842 - 859
  • [30] STUDY ON TYPES OF DEFECTIVE CONTRASTS BY SIMULATION
    ESNOUF, C
    MERLE, P
    PERNOUX, E
    JOURNAL DE MICROSCOPIE, 1972, 14 (02): : A5 - +