TYPES, CAUSES, AND EFFECTS OF DEFECTIVE CONSTRUCTION WORKS

被引:0
|
作者
Jareanvanun, Pornsak [1 ]
Sutheerawatthana, Pitch [2 ]
机构
[1] King Mongkuts Univ Technol, Facil Off, Bangkok, Thailand
[2] King Mongkuts Univ Technol, Dept Civil Engn, Bangkok, Thailand
关键词
Continues Improvement; Defect; Delay; Risk; Sustainable Solution;
D O I
暂无
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
Reviews of performance after construction completion is an important task for enhancing the sustainability of engineering solutions for social needs. This research reviewed and investigated defects in some construction projects of a university. The article analyzed types, causes, and effects of defects in terms of both time and cost dimensions. It collected data through the investigation of how completion certificates and contract documents are issued. It also gathered information on the causes of defects by interviewing project supervisors and those involved projects. The result showed that the majority of defects were in the architectural work, accounting for 57.1% of the total. The chance of having defects depends on the type of project. The main causes were foremen, workers, and working procedures. In the defective projects, defects caused delay in obtaining payment, averaging approximately 26 days. Defects also caused cost increases, averaging 3.3% of the initial contract value. These findings are vital for the construction department of the university to continuously improve and find more sustainable solutions in monitoring and supervising construction projects, so that fewer defects occur.
引用
收藏
页码:513 / 518
页数:6
相关论文
共 50 条
  • [1] Study on the Price Types of Construction Contracts for Construction Works
    Zhang, Hao
    Liu, Chengbin
    Gao, Xiuqing
    PROCEEDINGS OF THE 2016 INTERNATIONAL CONFERENCE ON ADVANCES IN MANAGEMENT, ARTS AND HUMANITIES SCIENCE (AMAHS 2016), 2016, 63 : 274 - 279
  • [2] CAUSES OF ACCIDENTS AT CONSTRUCTION SITES .1. DEFECTIVE MACHINERY
    不详
    ELEKTROTECHNISCHE ZEITSCHRIFT B-AUSGABE, 1978, 30 (13): : 473 - 473
  • [3] Construction claims, their types and causes in the private construction industry in the Kingdom of Bahrain
    Al Malki Y.M.
    Alam M.S.
    Asian Journal of Civil Engineering, 2021, 22 (3) : 477 - 484
  • [4] Delay Causes and Types in Nigerian Power Construction Projects
    Ismaila, Usman
    Jung, Wooyong
    Park, Chan Young
    ENERGIES, 2022, 15 (03)
  • [5] Investigating the types, causes and severity of claims in construction projects in the UAE
    Zaneldin, Essam K.
    INTERNATIONAL JOURNAL OF CONSTRUCTION MANAGEMENT, 2020, 20 (05) : 385 - 401
  • [6] Electric utility construction: Causes and types of field change orders
    Nguyen F.B.T.
    Grigg N.
    Valdes-Vasquez R.
    Electricity Journal, 2023, 36 (08):
  • [7] CAUSES AND EFFECTS OF VARIATIONS ON CONSTRUCTION PROJECTS
    Jayawardena, Nishadi
    Ramachandra, Thanuja
    Rotimi, James
    SUSTAINABLE SOLUTIONS IN STRUCTURAL ENGINEERING AND CONSTRUCTION, 2014, : 483 - 488
  • [8] Quality Management in Construction V. Problems with the Quality of the Works and their Causes
    Simion-Melinte, Cezar
    QUALITY-ACCESS TO SUCCESS, 2013, 14 (136): : 76 - 78
  • [9] Factionalism in Southeast Asia: Types, Causes, and Effects
    Hicken, Allen
    Tan, Netina
    JOURNAL OF CURRENT SOUTHEAST ASIAN AFFAIRS, 2020, 39 (01) : 187 - 204
  • [10] Variations in wheat types - Some causes and effects
    Fitz, LA
    INDUSTRIAL AND ENGINEERING CHEMISTRY, 1923, 15 : 1215 - 1217