Modeling the dynamics of an infrastructure project

被引:21
|
作者
Nguyen, LD
Ogunlana, SO
机构
[1] Asian Inst Technol, Sch Civil Engn, Klongluang 12120, Pathumthani, Thailand
[2] Univ Calif Berkeley, Dept Civil & Environm Engn, Berkeley, CA 94720 USA
关键词
D O I
10.1111/j.1467-8667.2005.00392
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
Contractors frequently encounter various problems during project construction, even when properly employing traditional project management techniques and tools. These problems result in low project performance and poor project outcome. A dynamic simulation model is proposed to capture the dynamics of construction projects in the construction phase. Eight key feedback structures from previous models of project dynamics and the unique characteristics of construction projects are identified as dynamic hypotheses. They include the structures of labor, equipment, material, labor and equipment interaction, schedule, rework, safety, and quality. Subsequently, a formal simulation model is mathematically formulated in terms of stock and flow diagrams. The model is then calibrated into a real project under construction. Part of testing indicates that the simulated behavior of the model and the actual behavior of the project are similar This implies that the model is able to simulate the dynamics of the project and, consequently, to enhance project monitoring and control.
引用
收藏
页码:265 / 279
页数:15
相关论文
共 50 条
  • [41] The Foresight Intelligent Infrastructure Systems project
    Traffic Engineering and Control, 2007, 48 (04): : 157 - 158
  • [42] Infrastructure Project Formulation: A Comprehensive Approach
    Bishawajeet, D.
    Surendra, B.
    Mridul, G.
    URBANIZATION CHALLENGES IN EMERGING ECONOMIES: RESILIENCE AND SUSTAINABILITY OF INFRASTRUCTURE, 2018, : 338 - 344
  • [43] Language Processing Infrastructure in the XLike Project
    Padro, Lluis
    Agic, Zeljko
    Carreras, Xavier
    Fortuna, Blaz
    Garcia-Cuesta, Esteban
    Li, Zhixing
    Stajner, Tadej
    Tadic, Marko
    LREC 2014 - NINTH INTERNATIONAL CONFERENCE ON LANGUAGE RESOURCES AND EVALUATION, 2014, : 3811 - 3816
  • [44] The project insurance option in infrastructure procurement
    Ndekugri, Issaka
    Daeche, Hannah
    Zhou, Diwei
    ENGINEERING CONSTRUCTION AND ARCHITECTURAL MANAGEMENT, 2013, 20 (03) : 267 - +
  • [45] AN INFRASTRUCTURE OF RESEARCH FOR ARCHAEOLOGY: THE ARIADNE PROJECT
    Niccolucci, Franco
    ARCHEOLOGIA E CALCOLATORI, 2015, : 41 - 44
  • [46] Motivational misalignment on an iconic infrastructure project
    Rose, Timothy
    Manley, Karen
    BUILDING RESEARCH AND INFORMATION, 2010, 38 (02): : 144 - 156
  • [47] Adaptive management approach to an infrastructure project
    Wirkus, Marek
    PROCEEDINGS OF THE 29TH IPMA WORLD CONGRESS WC2015, 2016, 226 : 414 - 422
  • [48] Hydrogen Infrastructure Project Risks in The Netherlands
    Vasbinder, Pieter W. M.
    de Vries, Antoine W. G.
    Westerman, Wim
    ENERGIES, 2021, 14 (19)
  • [49] Green Stormwater Infrastructure (GSI) Hydrologic Modeling: Albion Riverside Park Project in Los Angeles, California
    Sadeghi, K. Majid
    Tam, Wing
    Kharaghani, Shahram
    Loaiciga, Hugo
    WORLD ENVIRONMENTAL AND WATER RESOURCES CONGRESS 2020: WATER, WASTEWATER, AND STORMWATER AND WATER DESALINATION AND REUSE, 2020, : 258 - 271
  • [50] Implementation of Building Information modeling in Vietnamese infrastructure construction: A case study of institutional influences on a bridge project
    Bui, Nam
    ELECTRONIC JOURNAL OF INFORMATION SYSTEMS IN DEVELOPING COUNTRIES, 2020, 86 (04):