Parallel robot scheduling to minimize mean tardiness with precedence constraints using a genetic algorithm

被引:16
|
作者
Cakar, Tarik [1 ]
Koeker, Rasit
Demir, H. Ibrahim
机构
[1] Sakarya Univ, Fac Engn, Dept Ind Engn, TR-54187 Sakarya, Turkey
[2] Sakarya Univ, Fac Engn, Dept Comp Engn, TR-54187 Sakarya, Turkey
关键词
parallel robot scheduling; genetic algorithms; precedence constraints; mean tardiness;
D O I
10.1016/j.advengsoft.2006.11.003
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
Identical parallel robot scheduling problem for minimizing mean tardiness with precedence constraints is a very important scheduling problem. But, the solution of this problem becomes much difficult when there are a number of robots, jobs and precedence constraints. Genetic algorithm is an efficient tool in the solution of combinatorial optimization problems, as it is well known. In this study, a genetic algorithm is used to schedule jobs that have precedence constraints minimizing the mean tardiness on identical parallel robots. The solutions of problems, which have been taken in different scales, have been done using simulated annealing and genetic algorithm. In particular, genetic algorithm is found noteworthy successful in large-scale problems. (c) 2006 Elsevier Ltd. All rights reserved.
引用
收藏
页码:47 / 54
页数:8
相关论文
共 50 条
  • [31] Scheduling parallel machines to minimize total weighted and unweighted tardiness
    Alidaee, B
    Rosa, D
    COMPUTERS & OPERATIONS RESEARCH, 1997, 24 (08) : 775 - 788
  • [32] Scheduling unrelated parallel machines to minimize total weighted tardiness
    Liaw, CF
    Lin, YK
    Cheng, CY
    Chen, MC
    COMPUTERS & OPERATIONS RESEARCH, 2003, 30 (12) : 1777 - 1789
  • [33] Online scheduling with chain precedence constraints of equal-length jobs on parallel machines to minimize makespan
    Xing Chai
    Wenhua Li
    Journal of Combinatorial Optimization, 2018, 36 : 472 - 492
  • [34] Online scheduling with chain precedence constraints of equal-length jobs on parallel machines to minimize makespan
    Chai, Xing
    Li, Wenhua
    JOURNAL OF COMBINATORIAL OPTIMIZATION, 2018, 36 (02) : 472 - 492
  • [35] Inference search algorithm for optimizing scheduling and minimizing mean tardiness in parallel joint robots
    Tamizi, Saman
    Ghaffari, Ali
    JOURNAL OF AMBIENT INTELLIGENCE AND HUMANIZED COMPUTING, 2019, 10 (12) : 4771 - 4783
  • [36] Inference search algorithm for optimizing scheduling and minimizing mean tardiness in parallel joint robots
    Saman Tamizi
    Ali Ghaffari
    Journal of Ambient Intelligence and Humanized Computing, 2019, 10 : 4771 - 4783
  • [37] A Genetic Algorithm Approach for Minimizing Total Tardiness in Parallel Machine Scheduling Problems
    Demirel, Tufan
    Ozkir, Vildan
    Demirel, Nihan Cetin
    Tasdelen, Belgin
    WORLD CONGRESS ON ENGINEERING, WCE 2011, VOL II, 2011, : 1190 - 1193
  • [38] A hybrid genetic algorithm for integrated process planning and scheduling problem with precedence constraints
    Amin-Naseri, M. R.
    Afshari, Ahmad J.
    INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2012, 59 (1-4): : 273 - 287
  • [39] A hybrid genetic algorithm for integrated process planning and scheduling problem with precedence constraints
    M. R. Amin-Naseri
    Ahmad J. Afshari
    The International Journal of Advanced Manufacturing Technology, 2012, 59 : 273 - 287
  • [40] A monotone approximation algorithm for scheduling with precedence constraints
    Krumke, Sven O.
    Schwahn, Anne
    van Stee, Rob
    Westphal, Stephan
    OPERATIONS RESEARCH LETTERS, 2008, 36 (02) : 247 - 249