A global dynamic model for job shop scheduling

被引:0
|
作者
Zhou, X [1 ]
Gao, LS [1 ]
Ruan, H [1 ]
机构
[1] Beijing Univ Aeronaut & Astronaut, Beijing 100083, Peoples R China
来源
PROGRESS OF MACHINING TECHNOLOGY: WITH SOME TOPICS IN ADVANCED MANUFACTURING TECHNOLOGY | 2000年
关键词
job shop scheduling; integrated priority; relaxation; problem prediction mechanism;
D O I
暂无
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
After a brief review of job shop scheduling, this paper made an analysis on problems that may be caused by unreasonable hypotheses when designing the scheduling algorithm. A global dynamic model mainly made up of integrated priority, resource utility rate balance and problem prediction mechanism, was presented. A way of implementation based on the model was also provided. The simulation of practical data proved that the model can meet the requirements of real production environment in some ways.
引用
收藏
页码:942 / 947
页数:6
相关论文
共 50 条
  • [41] Learning based dynamic approach to job-shop scheduling
    Liang, W
    Yu, HB
    2001 INTERNATIONAL CONFERENCES ON INFO-TECH AND INFO-NET PROCEEDINGS, CONFERENCE A-G: INFO-TECH & INFO-NET: A KEY TO BETTER LIFE, 2001, : C274 - C279
  • [42] Agent-based Job Shop scheduling model
    Zhang, Y.
    Sun, X.P.
    Yin, C.W.
    Wang, C.E.
    Zhongguo Jixie Gongcheng/China Mechanical Engineering, 2001, 12 (10):
  • [43] An Efficient Metaheuristic Algorithm for Job Shop Scheduling in a Dynamic Environment
    Zhang, Hankun
    Buchmeister, Borut
    Li, Xueyan
    Ojstersek, Robert
    MATHEMATICS, 2023, 11 (10)
  • [44] AN EFFICIENT DYNAMIC DISPATCHING RULE FOR SCHEDULING IN A JOB-SHOP
    RAGHU, TS
    RAJENDRAN, C
    INTERNATIONAL JOURNAL OF PRODUCTION ECONOMICS, 1993, 32 (03) : 301 - 313
  • [45] Dynamic job shop scheduling for missed due date performance
    Alpay, Serafettin
    Yuzugullu, Nihat
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2009, 47 (15) : 4047 - 4062
  • [46] A batch splitting heuristic for dynamic job shop scheduling problem
    Jeong, H
    Woo, S
    Kang, S
    Park, J
    COMPUTERS & INDUSTRIAL ENGINEERING, 1997, 33 (3-4) : 781 - 784
  • [47] Dynamic scheduling on multi-objective flexible Job Shop
    Liu, Ai-Jun
    Yang, Yu
    Xing, Qing-Song
    Lu, Hui
    Zhang, Yu-Dong
    Zhou, Zhen-Yu
    Wu, Guang-Hui
    Zhao, Xiao-Hua
    Jisuanji Jicheng Zhizao Xitong/Computer Integrated Manufacturing Systems, CIMS, 2011, 17 (12): : 2629 - 2637
  • [48] Study on the job shop dynamic scheduling under fuzzy environments
    Li Fu-ming
    Zhu Yun-long
    2006 INTERNATIONAL CONFERENCE ON COMPUTATIONAL INTELLIGENCE AND SECURITY, PTS 1 AND 2, PROCEEDINGS, 2006, : 90 - 96
  • [49] Job Shop Scheduling with Dynamic Fuzzy Selection of Dispatching Rules
    V. Subramaniam
    T. Ramesh
    G. K. Lee
    Y. S. Wong
    G. S. Hong
    The International Journal of Advanced Manufacturing Technology, 2000, 16 : 759 - 764
  • [50] Digital Twin Enhanced Dynamic Job-Shop Scheduling
    Zhang, Meng
    Tao, Fei
    Nee, A. Y. C.
    JOURNAL OF MANUFACTURING SYSTEMS, 2021, 58 : 146 - 156