Pollutant removal by an integrated vertical-flow constructed wetland treating simulated river water by reoxygenation

被引:1
|
作者
Lu, S. Y. [1 ,2 ]
Xing, Y. [3 ]
Liu, J. [1 ,2 ,3 ]
Jin, X. C. [1 ,2 ]
Qu, J. T. [1 ,2 ,4 ]
机构
[1] Res Ctr Lake Environm, State Environm Protect Key Lab Lake Pollut Contro, Civil & Environm Engn Sch, Engn & Technol Ctr Lake,SEPSORSLD, Beijing, Peoples R China
[2] Chinese Res Inst Environm Sci, State Key Lab Environm Criteria & Risk Assessment, Beijing, Peoples R China
[3] Univ Sci & Technol Beijing, Civil & Environm Engn Sch, Beijing 100083, Peoples R China
[4] Shandong Univ, Sch Environm Sci & Engn, Jinan 250100, Peoples R China
来源
关键词
phosphorus removal; integrated vertical-flow constructed wetland; nitrogen removal; zeolite; simulated river water; WASTE-WATER; PHOSPHORUS; SYSTEMS; RETENTION; NITROGEN; IMPACT; LAKE;
D O I
10.1080/02772248.2015.1050189
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
The effects and mechanism of chemical oxygen demand (COD), nitrogen, and phosphorus concentration removal by an integrated vertical-flow constructed wetland were studied in the wetland system during one inlet-outlet operating period, in two typical stages (each stage is connective 24 h, sampled once every 4 h). The concentration of ammonia decreased along the flow direction in the system, while levels of nitrate (NO3--N) increased. In one operating period, total nitrogen (TN) concentration fell with rising operation time due to evacuative reoxygenation. The TN and NH3-N removal rates in the system were 26.6% and 97.5%, respectively. COD decreased rapidly in the early stages and more gradually in the direction of water flow of the wetland system. Average total phosphorus (TP) removal rate was 20.71%. TN and NO3--N levels in water of the wetland had a tendency to decline gradually with increasing operation time. Ammonia concentrations displayed only a small variation with operation time. The results also indicated that the wetland was able to maintain its temperature. The oxygen content differed during the various operating stages and exerted a marked influence on COD, TP, and TN removal.
引用
收藏
页码:358 / 366
页数:9
相关论文
共 50 条
  • [41] Nitrogen removal efficiency of surface flow constructed wetland for treating slightly polluted river water
    Wei, Dingbing
    Singh, Rajendra Prasad
    Li, Yangke
    Fu, Dafang
    ENVIRONMENTAL SCIENCE AND POLLUTION RESEARCH, 2020, 27 (20) : 24902 - 24913
  • [42] Influence of alternate operation on clogging in a vertical-flow constructed wetland
    Shanghai Academy of Environmental Sciences, Shanghai 200233, China
    不详
    Huanjing Kexue Xuebao, 2008, 8 (1555-1560):
  • [43] Removal of nutrients from saline waste sewage with different vertical-flow constructed wetland substrates
    Ma Chao
    Ding Hui
    Sun Yichao
    Deng Xiaowen
    PROGRESS IN ENVIRONMENTAL SCIENCE AND ENGINEERING (ICEESD2011), PTS 1-5, 2012, 356-360 : 1189 - +
  • [44] Benzene removal with vertical-flow constructed treatment wetlands
    Eke, Paul E.
    Scholz, Miklas
    JOURNAL OF CHEMICAL TECHNOLOGY AND BIOTECHNOLOGY, 2008, 83 (01) : 55 - 63
  • [45] A Study of Nitrogen Removal Ability in Integrated Vertical Flow Constructed Wetland
    Guo Jia-sheng
    Lu Shao-yong
    Liu Jing
    Wang Ji
    Xing Yi
    Jin Xiang-can
    2011 INTERNATIONAL CONFERENCE ON ENVIRONMENTAL SYSTEMS SCIENCE AND ENGINEERING (ICESSE 2011), VOL 3, 2011, : 335 - 341
  • [46] Assessment of pathogen removal efficiency of vertical flow constructed wetland treating septage
    Swati Singh
    Sweta Upadhyay
    Anju Rani
    Pradeep Kumar Sharma
    Janhvi Mishra Rawat
    Balwant Rawat
    Prosun Prashant
    Scientific Reports, 13
  • [47] Assessment of pathogen removal efficiency of vertical flow constructed wetland treating septage
    Singh, Swati
    Upadhyay, Sweta
    Rani, Anju
    Sharma, Pradeep Kumar
    Rawat, Janhvi Mishra
    Rawat, Balwant
    Prashant
    Bhattacharya, Prosun
    SCIENTIFIC REPORTS, 2023, 13 (01)
  • [48] RESPONSES OF ENZYME ACTIVITIES AND MICROBIAL COMMUNITY STRUCTURE IN AN AERATED INTEGRATED VERTICAL-FLOW CONSTRUCTED WETLAND
    Tao, Min
    He, Feng
    Li, Sheng Fang
    Wu, Zhen-Bin
    Wang, Qi Shuo
    FRESENIUS ENVIRONMENTAL BULLETIN, 2015, 24 (1B): : 371 - 378
  • [49] Nitrate removal from tail water by integrated vertical-flow constructed wetlands at a high hydraulic loading rate
    Chang, Jun-jun
    Wu, Su-qing
    Dai, Yanran
    Wu, Zhen-bin
    Liang, Wei
    DESALINATION AND WATER TREATMENT, 2013, 51 (31-33) : 6031 - 6037
  • [50] Removal of total nitrogen by Cyperus alternifolius from wastewaters in simulated vertical-flow constructed wetlands
    Cui, Li-Hua
    Ouyang, Ying
    Chen, Yin
    Zhu, Xi-Zhen
    Zhu, Wen-Ling
    ECOLOGICAL ENGINEERING, 2009, 35 (08) : 1271 - 1274