Dashengguan Bridge-The Largest Span Steel Arch Bridge for High-Speed Railway

被引:13
|
作者
Gao, Zongyu [1 ]
Vi, Lunxiong [1 ]
Xiao, Hai Zhu [1 ]
机构
[1] China Railway Major Bridge Reconnaissance & Desig, Wuhan, Peoples R China
关键词
high-speed railway bridge; Dashengguan Bridge; steel arch truss bridge; three-plane trusses; railway orthotropic deck; stiffened hanger;
D O I
10.2749/101686610792016907
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
The Nanjing Dashengguan Bridge is a key project on the Beijing Shanghai high-speed railway; it is designed to handle a speed of 300 km/h. The main bridge has a large-span continuous steel arch truss structure with a total length of 1615 m. The two main spans over the main navigation channels of the Yangtze River are steel arch trusses, each of which is 336 m long. The arches comprise three truss planes above the orthotropic deck. Erection of the steel arch truss adopted the double cantilever method with auxiliary cables supported by towers on piers.
引用
收藏
页码:299 / 302
页数:4
相关论文
共 50 条
  • [41] Mechanical analysis of through tied-arch composite bridge on high-speed railway
    Zhou, De
    Ye, Mei-Xin
    Luo, Ru-Deng
    Zhongnan Daxue Xuebao (Ziran Kexue Ban)/Journal of Central South University (Science and Technology), 2009, 40 (05): : 1457 - 1464
  • [42] Ganjiang Bridge: A High-Speed Railway Long-Span Cable-Stayed Bridge Laying Ballastless Tracks
    Sheng, Xingwang
    Zheng, Weiqi
    Zhu, Zhihui
    Yan, Aiguo
    Qin, Yongping
    STRUCTURAL ENGINEERING INTERNATIONAL, 2021, 31 (01) : 40 - 44
  • [43] Influence of Bearing Friction on Track-Bridge Interaction of Long-Span Suspension Bridge of High-Speed Railway
    Yu X.
    Chen Z.
    Jing H.
    Zhongguo Tiedao Kexue/China Railway Science, 2023, 44 (01): : 114 - 124
  • [44] Running Safety of High-speed Railway Concrete-filled Steel Tube Arch Bridge under Extreme Temperature
    Gou, Hongye
    Su, Zhenqian
    Wang, Junming
    Yuan, Wei
    Chen, Zeyu
    Journal of Railway Engineering Society, 2023, 40 (03) : 50 - 56
  • [45] Design and research on basket handle arch bridge by method of arch first and beam late in high-speed railway
    Zhao, Zhi-Jun
    Journal of Railway Engineering Society, 2013, 30 (12) : 41 - 45
  • [46] Study on Condition Assessment of Highway Bridge, Normal-Speed and High-Speed Railway Bridge
    Wei, Zhao Lan
    Pu, Qian Hui
    Wang, Bin Li
    MECHATRONICS AND MATERIALS PROCESSING I, PTS 1-3, 2011, 328-330 : 1026 - 1030
  • [47] High-Speed Railway Bridge and Pile Foundation: A Review
    Bachinilla, Brian
    Evangelista, Ana
    Siddhpura, Milind
    Haddad, Assed N.
    da Costa, Bruno B. F.
    INFRASTRUCTURES, 2022, 7 (11)
  • [48] Dynamic responses of high-speed railway continuous bridge
    Wang, Qingbo
    Wang, Sheng
    Xu, Kebin
    Xia, He
    Beifang Jiaotong Daxue Xuebao/Journal of Northern Jiaotong University, 1997, 21 (04): : 399 - 404
  • [49] The Adaptive Contrast Research on the Slab Track of High-speed Railway in Long Span Bridge End
    高铁单元板式无砟轨道大跨梁端适应性对比
    Wang, Ji-Jun, 2018, Editorial Department of Journal of Railway Engineering Society, China (35)
  • [50] Analysis of medium and small span curved bridge composed of straight girders in high-speed railway
    Tiedao Xuebao/Journal of the China Railway Society, 2000, 22 (04): : 113 - 116