Optimization of the LPCVD Equipment Intergraded Production System of the Solar Cell Production Line

被引:1
|
作者
Dong, Xiaohui [1 ]
Ma, Ruhong [1 ]
机构
[1] Yancheng Inst Technol, Yancheng 224051, Peoples R China
关键词
Amorphous silicon thin-film solar cell; LPCVD equipment; production system; optimization;
D O I
10.1063/1.5116492
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
To address the problem that the actual production capacity of the thin-film solar cell production line has been usually lower than the designed capacity, this study analyzed the indicators of various production processes, including WIP, Queue Time and Uptime, and observed that LPCVD is the critical process leading to low productivity. Meanwhile, the primary reason for the occurrence of frequent failures in this process is that the control logic of robot feeding and reclaiming is too complex, and the data transmission volume between different interfaces is too huge. In view of such a situation, this study proposed to assign priority to the job list of the LPCVD process. This solution attempts to reduce the data transmission volume between interfaces by modifying priority of the instruction received by the robot without changing data communication interfaces, so as to decrease system failures. The results of implementation show that the production capacity after optimization approaches to 100%. At the same time, the robot workload is significantly reduced, while the operational life of the equipment is lengthened. Furthermore, the comparative analysis of Uptime, WIP and Queue time and the analysis of robot efficiency confirms the feasibility and operability of this optimization scheme.
引用
收藏
页数:5
相关论文
共 50 条
  • [1] Line septum solar cell for hydrogen production
    Pawar, SH
    Pawar, PD
    INDIAN JOURNAL OF PURE & APPLIED PHYSICS, 1996, 34 (07) : 504 - 505
  • [2] Simulation of the Solar Cell Production Amorphous Silicon Thin-Film Solar Cell Production System
    Dong, Xiaohui
    Ma, Ruhong
    2ND INTERNATIONAL CONFERENCE ON GREEN ENERGY AND SUSTAINABLE DEVELOPMENT (GESD 2019), 2019, 2122
  • [3] Analysis of the Application of the Laser Equipment in the Production Line of the Amorphous Silicon Film Solar Cells
    Huang, Xinhua
    Mei, Lixue
    2014 2ND INTERNATIONAL CONFERENCE ON SOCIAL SCIENCE AND HEALTH (ICSSH 2014), PT 2, 2014, 56 : 14 - 17
  • [4] Solar Cell Production
    1600, Springer Verlag (140):
  • [5] AUTOMATIC EQUIPMENT ON NEW ELECTROLUX PRODUCTION LINE
    不详
    MODERN REFRIGERATION AND AIR CONDITIONING, 1968, 71 (849): : 49 - &
  • [6] Optimization and Application of Flexible Production Line Production Scheduling
    Liu, Yefeng
    Zhao, Yuan
    Li, Kangju
    Yu, Shengping
    PROCEEDINGS OF THE 39TH CHINESE CONTROL CONFERENCE, 2020, : 1472 - 1476
  • [7] Equipment for new cement production line in Russia
    不详
    ZKG INTERNATIONAL, 2011, 64 (01): : 6 - 6
  • [8] A distributed decision making system for integrated optimization of production scheduling and distribution for aluminum production line
    Nishi, Tatsushi
    Konishi, Masami
    Ago, Masatoshi
    COMPUTERS & CHEMICAL ENGINEERING, 2007, 31 (10) : 1205 - 1221
  • [9] Lead time analysis and optimization for intermittently moving production line under mixed production system
    He, Z
    Che, JG
    Cui, Q
    PROCEEDINGS OF THE 11TH INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT, VOLS 1 AND 2: INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT IN THE GLOBAL ECONOMY, 2005, : 340 - 344
  • [10] On-line monitoring of solar cell module production by ellipsometry technique
    Fried, M.
    THIN SOLID FILMS, 2014, 571 : 345 - 355