A fuzzy dynamic Inoperability Input-output Model for strategic risk management in Global Production Networks

被引:28
|
作者
Niknejad, Ali [1 ]
Petrovic, Dobrila [1 ]
机构
[1] Coventry Univ, Fac Engn Environm & Comp, Coventry CV1 5FB, W Midlands, England
关键词
Risk management; Inoperability Input Output Models; Global Production Networks; Supply Chain Management Risk; Fuzzy arithmetic; Dynamic models; PROPAGATION;
D O I
10.1016/j.ijpe.2016.05.017
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
Strategic decision making in Global Production Networks (GPNs) is quite challenging, especially due to the unavailability of precise quantitative knowledge, variety of relevant risk factors that needs to be considered and the interdependencies that can exist between multiple partners across the globe. In this paper, a risk evaluation method for GPNs based on a novel Fuzzy Dynamic Inoperability Input Output Model (Fuzzy DIIM) is proposed. A fuzzy multi-criteria approach is developed to determine interdependencies between nodes in a GPN using experts' knowledge. An efficient and accurate method based on fuzzy interval calculus in the Fuzzy DIIM is proposed. The risk evaluation method takes into account various risk scenarios relevant to the GPN and likelihoods of their occurrences. A case of beverage production from the food industry is used to showcase the application of the proposed risk evaluation method. It is demonstrated how it can be used for GPN strategic decision making. The impact of risk on inoperability of alternative GPN configurations considering different risk scenarios is analysed. (C) 2016 Elsevier B.V. All rights reserved.
引用
收藏
页码:44 / 58
页数:15
相关论文
共 50 条
  • [41] Impacts of transport strike on Pakistan economy: An inoperability Input-Output model (IIOM) approach
    Ali, Yousaf
    Bilal, Muhammad
    Sabir, Muhammad
    RESEARCH IN TRANSPORTATION ECONOMICS, 2021, 90
  • [42] Inoperability Input-Output Model for Interdependent Infrastructure Sectors. I: Theory and Methodology
    Haimes, Yacov Y.
    Horowitz, Barry M.
    Lambert, James H.
    Santos, Joost R.
    Lian, Chenyang
    Crowther, Kenneth G.
    JOURNAL OF INFRASTRUCTURE SYSTEMS, 2005, 11 (02) : 67 - 79
  • [43] MULTIPLE FUZZY REGRESSION MODEL FOR FUZZY INPUT-OUTPUT DATA
    Chachi, J.
    Taheri, S. M.
    IRANIAN JOURNAL OF FUZZY SYSTEMS, 2016, 13 (04): : 63 - 78
  • [44] A Dynamic Input-Output Model Solution withConsumption
    GENG Xianmin(Xinjiang Petroleum Institute
    Journal of Systems Science and Systems Engineering, 1999, (02) : 140 - 150
  • [46] Dynamic energy input-output model: A frame
    Zheng, ZN
    Liu, DS
    PROCEEDINGS OF 2003 INTERNATIONAL CONFERENCE ON MANAGEMENT SCIENCE & ENGINEERING, VOLS I AND II, 2003, : 2283 - 2288
  • [47] A CONTINUOUS LEONTIEF DYNAMIC INPUT-OUTPUT MODEL
    JOHNSON, T
    PAPERS OF THE REGIONAL SCIENCE ASSOCIATION, 1985, 56 : 177 - 188
  • [48] A dynamic input-output model with renewable resources
    Dobos, Imre
    Tallos, Peter
    CENTRAL EUROPEAN JOURNAL OF OPERATIONS RESEARCH, 2013, 21 (02) : 295 - 305
  • [49] A dynamic input-output model with renewable resources
    Imre Dobos
    Peter Tallos
    Central European Journal of Operations Research, 2013, 21 : 295 - 305
  • [50] EXPERIMENTAL CONSTRUCTION OF A DYNAMIC INPUT-OUTPUT MODEL
    BIRGER, ES
    URINSON, IM
    CHARNYI, VI
    MATEKON, 1979, 15 (03): : 59 - 82