Modified Exponential Weighted Moving Average (EWMA) Control Chart on Autocorrelation Data

被引:11
|
作者
Herdiani, Erna Tri [1 ]
Fandrilla, Geysa [1 ]
Sunusi, Nurtiti [1 ]
机构
[1] Hasanuddin Univ, Study Program Stat, Fac Math & Nat Sci, Makassar, Indonesia
关键词
D O I
10.1088/1742-6596/979/1/012097
中图分类号
O [数理科学和化学]; P [天文学、地球科学]; Q [生物科学]; N [自然科学总论];
学科分类号
07 ; 0710 ; 09 ;
摘要
In general, observations of the statistical process control are assumed to be mutually independence. However, this assumption is often violated in practice. Consequently, statistical process controls were developed for interrelated processes, including Shewhart, Cumulative Sum (CUSUM), and exponentially weighted moving average (EWMA) control charts in the data that were autocorrelation. One researcher stated that this chart is not suitable if the same control limits are used in the case of independent variables. For this reason, it is necessary to apply the time series model in building the control chart. A classical control chart for independent variables is usually applied to residual processes. This procedure is permitted provided that residuals are independent. In 1978, Shewhart modification for the autoregressive process was introduced by using the distance between the sample mean and the target value compared to the standard deviation of the autocorrelation process. In this paper we will examine the mean of EWMA for autocorrelation process derived from Montgomery and Patel. Performance to be investigated was investigated by examining Average Run Length (ARL) based on the Markov Chain Method.
引用
收藏
页数:7
相关论文
共 50 条
  • [31] Another objection to the homogeneously weighted moving average control chart
    Knoth, Sven
    QUALITY AND RELIABILITY ENGINEERING INTERNATIONAL, 2023, 39 (01) : 353 - 362
  • [32] An Optimization Design of the Exponentially Weighted Moving Average Control Chart
    Aghniaei, Mona
    Shamsuzzaman, Mohammad
    Hamdan, Sadeque
    2017 IEEE INTERNATIONAL CONFERENCE ON INDUSTRIAL ENGINEERING AND ENGINEERING MANAGEMENT (IEEM), 2017, : 1719 - 1722
  • [33] Fuzzy multivariate exponentially weighted moving average control chart
    Hossein Alipour
    Rassoul Noorossana
    The International Journal of Advanced Manufacturing Technology, 2010, 48 : 1001 - 1007
  • [34] A double generally weighted moving average exceedance control chart
    Karakani, Hossein Masoumi
    Human, Schalk William
    van Niekerk, Janet
    QUALITY AND RELIABILITY ENGINEERING INTERNATIONAL, 2019, 35 (01) : 224 - 245
  • [35] On the Development of Triple Homogeneously Weighted Moving Average Control Chart
    Riaz, Muhammad
    Abbas, Zameer
    Nazir, Hafiz Zafar
    Abid, Muhammad
    SYMMETRY-BASEL, 2021, 13 (02): : 1 - 21
  • [36] A Multivariate Adaptive Exponentially Weighted Moving Average Control Chart
    Mahmoud, Mahmoud A.
    Zahran, Alyaa R.
    COMMUNICATIONS IN STATISTICS-THEORY AND METHODS, 2010, 39 (04) : 606 - 625
  • [37] Fuzzy multivariate exponentially weighted moving average control chart
    Alipour, Hossein
    Noorossana, Rassoul
    INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2010, 48 (9-12): : 1001 - 1007
  • [38] A multivariate triple exponentially weighted moving average control chart
    Malela-Majika, Jean-Claude
    Chatterjee, Kashinath
    Koukouvinos, Christos
    QUALITY AND RELIABILITY ENGINEERING INTERNATIONAL, 2022, 38 (04) : 1558 - 1589
  • [40] A Sum of Squares Generally Weighted Moving Average Control Chart
    Huang, Chi-Jui
    COMMUNICATIONS IN STATISTICS-THEORY AND METHODS, 2014, 43 (23) : 5052 - 5071