Incomplete Contracts in Multi-period Procurement

被引:3
|
作者
Gretschko, Vitali [1 ,2 ]
Pollrich, Martin [3 ]
机构
[1] Univ Mannheim, D-68131 Mannheim, Germany
[2] ZEW Leibniz Zentrum Europa Wirtsch Forsch GmbH, D-68161 Mannheim, Germany
[3] Univ Bonn, D-53113 Bonn, Germany
关键词
incomplete contracts; repeated relationships; procurement; commitment; AUCTION DESIGN;
D O I
10.1287/mnsc.2021.4123
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
We analyze the problem of a buyer who purchases a long-term project from one of several suppliers. A changing state of the world influences the costs of the suppliers. We distinguish between complete contracts conditioning on all future realizations of the state of the world and incomplete contracts renegotiated whenever the state of the world changes. We provide conditions such that incomplete contracting does not pose a problem. If the changing state of the world is publicly observable and the buyer cannot switch between suppliers during the lifetime of the project, the buyer achieves the same surplus irrespective of whether contracts are complete or incomplete. An English auction followed by renegotiation whenever the state of the world changes is optimal. To identify conditions when buyers should consider drafting complete contracts, we extend the analysis by considering private information about the changing state of the world and supplier switching. In both cases, incomplete contracting poses a problem. In a survey of procurement consultants, we confirm that publicly observable states of the world via price indexes play an important role in procurement. Moreover, the consultants confirm that supplier switching is infrequent in procurement practice. Thus, incomplete contracting is less of a problem in a considerable share of procurement projects. However, complete contracts are useful and could be used more often.
引用
收藏
页码:5146 / 5161
页数:16
相关论文
共 50 条
  • [41] Multi-period information markets
    Naik, NY
    JOURNAL OF ECONOMIC DYNAMICS & CONTROL, 1997, 21 (07): : 1229 - 1258
  • [42] Multi-period hydrogen management
    Imran, Ahmad Muhammad
    Megan, Jobson
    Nan, Zhang
    PRES'09: 12TH INTERNATIONAL CONFERENCE ON PROCESS INTEGRATION, MODELLING AND OPTIMISATION FOR ENERGY SAVING AND POLLUTION REDUCTION, PTS 1 AND 2, 2009, 18 : 743 - 748
  • [43] An integrated production and procurement design for a multi-period multi-product manufacturing system with machine assignment and warehouse constraint
    Vaziri, Shaghayegh
    Zaretalab, Arash
    Esmaeili, Mohammad
    Niaki, S. T. A.
    APPLIED SOFT COMPUTING, 2018, 70 : 238 - 262
  • [44] Contrasting principal stratum and hypothetical strategy estimands in multi-period crossover trials with incomplete data
    Matthews, John N. S.
    Bazakou, Sofia
    Henderson, Robin
    Sharples, Linda D.
    BIOMETRICS, 2023, 79 (03) : 1896 - 1907
  • [45] Optimal Sizing of Energy Storage Systems for the Energy Procurement Problem in Multi-Period Markets under Uncertainties
    Konishi, Ryusuke
    Takeda, Akiko
    Takahashi, Masaki
    ENERGIES, 2018, 11 (01)
  • [46] Exact and approximate algorithms for the multi-period procurement problem where dedicated supplier capacity can be reserved
    Costa, D
    Silver, EA
    OR SPEKTRUM, 1996, 18 (04) : 197 - 207
  • [47] Multi-day and multi-period data
    Madre, JL
    TRANSPORT SURVEY QUALITY AND INNOVATION, 2003, : 253 - 269
  • [48] Comparative Performance of Multi-Period ACOPF and Multi-Period DCOPF under High Integration of Wind Power
    Larrahondo, Diego
    Moreno, Ricardo
    Chamorro, Harold R.
    Gonzalez-Longatt, Francisco
    ENERGIES, 2021, 14 (15)
  • [49] Dynamic Procurement under Uncertainty: Optimal Design and Implications for Incomplete Contracts
    Arve, Malin
    Martimort, David
    AMERICAN ECONOMIC REVIEW, 2016, 106 (11): : 3238 - 3274
  • [50] Multi-Period Vehicle Routing with Limited Period Load
    Schoenberger, Joern
    IFAC PAPERSONLINE, 2016, 49 (02): : 24 - 29