Cold-standby Redundancy Optimization for Multi-Type Production Systems Using NSGA-II

被引:0
|
作者
Wang, Wei [1 ,2 ]
Xu, Yaofeng [1 ]
Wei, Jiqing [1 ]
Qu, Wei [1 ]
机构
[1] Northwest Inst Mech & Elect Engn, Xianyang, Peoples R China
[2] Univ Sci & Technol China, Dept Automat, Hefei, Anhui, Peoples R China
关键词
Multi-type production system; structure matrix; cold-standby redundancy allocation; system reliability; multi-objective optimization; NSGA-II;
D O I
暂无
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
This paper develops a new model for investigating cold-standby redundancy allocation problem (RAP) of a multi-type production system. The system consists of several independent linearly ordered subsystems which undertaking different tasks. The system can process different types of production. Each type of production requires a unique manufacturing line: required subsystems should be turned on, while others powered off. A binary matrix is used to describe the structure of multi-type production system. Cold-standby redundancy on subsystems is considered for achieving higher reliabilities of the different manufacturing lines. The RAP for the multi-type production system is essentially multi-objective subject to resource constraints. The paper formulates the multi-objective problem and solves it by using a well-known algorithm called NSGA-II. Finally, illustrative examples are presented.
引用
收藏
页码:1714 / 1718
页数:5
相关论文
共 50 条
  • [41] Optimization Production Scheduling of Underground Backfilling Mining Based on NSGA-II
    Yu Bao
    Yutao Wang
    Liang Zhao
    Aijuan Zhang
    Mining, Metallurgy & Exploration, 2022, 39 : 1521 - 1536
  • [42] Optimization Production Scheduling of Underground Backfilling Mining Based on NSGA-II
    Bao, Yu
    Wang, Yutao
    Zhao, Liang
    Zhang, Aijuan
    MINING METALLURGY & EXPLORATION, 2022, 39 (04) : 1521 - 1536
  • [43] A comprehensive survey on NSGA-II for multi-objective optimization and applications
    Ma, Haiping
    Zhang, Yajing
    Sun, Shengyi
    Liu, Ting
    Shan, Yu
    ARTIFICIAL INTELLIGENCE REVIEW, 2023, 56 (12) : 15217 - 15270
  • [44] Improving NSGA-II For Solving Multi Objective Function Optimization Problems
    Vachhani, Vimal L.
    Dabhi, Vipul K.
    Prajapati, Harshadkumar B.
    2016 INTERNATIONAL CONFERENCE ON COMPUTER COMMUNICATION AND INFORMATICS (ICCCI), 2016,
  • [45] Sequencing Optimization in k-out-of-n Cold-Standby Systems Considering Mission Cost
    Levitin, Gregory
    Xing, Liudong
    Dai, Yuanshun
    INTERNATIONAL JOURNAL OF GENERAL SYSTEMS, 2013, 42 (08) : 870 - 882
  • [46] Multi-objective Drilling Trajectory Optimization Based on NSGA-II
    Huang, Wendi
    Wu, Min
    Cheng, Jun
    Chen, Xin
    Cao, Weihua
    Hu, Yule
    Gao, Hui
    2017 11TH ASIAN CONTROL CONFERENCE (ASCC), 2017, : 1234 - 1239
  • [47] Comparison of NSGA-III with NSGA-II for multi objective optimization of adiabatic styrene reactor
    Chaudhari, Pranava
    Thakur, Amit K.
    Kumar, Rahul
    Banerjee, Nilanjana
    Kumar, Amit
    MATERIALS TODAY-PROCEEDINGS, 2022, 57 : 1509 - 1514
  • [48] Lay Length Optimization for Communication Cable Using NSGA-II
    Li P.
    Liu Y.
    Wang Y.-H.
    Beijing Youdian Daxue Xuebao, 2 (88-92): : 88 - 92
  • [49] Multi Objective Distributed Generation Planning Using NSGA-II
    Ahmadi, Muhammad
    Yousefi, Ashkan
    Soroudi, Alireza
    Ehsan, Mehdi
    2008 13TH INTERNATIONAL POWER ELECTRONICS AND MOTION CONTROL CONFERENCE, VOLS 1-5, 2008, : 1847 - +
  • [50] Multi-objective Fuzzy Modeling Using NSGA-II
    Xing Zong-Yi
    Zhang Yong
    Hou Yuan-Long
    Cai Guo-Qiang
    2008 IEEE CONFERENCE ON CYBERNETICS AND INTELLIGENT SYSTEMS, VOLS 1 AND 2, 2008, : 413 - +