Construction Process Monitoring of CCTV Main Building Structure in China

被引:0
|
作者
Liu, Jun-Jin [1 ]
Pan, Chong-Ping [1 ]
Li, Jian-Hui [1 ]
Yue, Li-Jie [1 ]
机构
[1] China Acad Bldg Res, Beijing, Peoples R China
关键词
Construction process monitoring; Deformation monitoring; Stress monitoring; Simulation analysis; Cantilever; Closure;
D O I
暂无
中图分类号
TE [石油、天然气工业]; TK [能源与动力工程];
学科分类号
0807 ; 0820 ;
摘要
The main building of CCTV (China Central Television) new site project consists of two leaning towers, which are linked together at the top via a large cantilever link element. During construction of the tower, it has the particularity in deformation of the structure and stress state of components, consequently, the safety control of the structure in the construction process is very important. The monitoring techniques and results are introduced, including the foundation settlement, the main structure stress, the structure deformation, and the cantilever deformation. The applications of monitoring and simulation analysis technologies in the construction process provide data support and guarantee the construction safety of the CCTV main building.
引用
收藏
页码:341 / 350
页数:10
相关论文
共 50 条
  • [21] Health Monitoring Research on the Central Sail of China Navigation Museum under Construction Process
    Lu Weidong
    Chen Lu
    Tang Hailin
    Zhu Binghu
    Zhang Qilin
    PROCEEDINGS OF SHANGHAI INTERNATIONAL CONFERENCE ON TECHNOLOGY OF ARCHITECTURE AND STRUCTURE, PT II, 2009, : 168 - 175
  • [22] DEVELOPMENT OF A CCTV SYSTEM FOR WELDER TRAINING AND MONITORING OF SPACE-SHUTTLE MAIN ENGINE WELDS
    GORDON, SS
    FLANIGAN, LA
    DYER, GE
    WELDING JOURNAL, 1987, 66 (03) : 47 - 54
  • [23] An investigation on construction byproducts and mixed ones in building construction process
    Nachi, Y
    Miyazaki, T
    2003 3RD INTERNATIONAL SYMPOSIUM ON ENVIRONMENTALLY CONSCIOUS DESIGN AND INVERSE MANUFACTURING - ECODESIGN '03, 2003, : 171 - 176
  • [24] Construction and building of the new Osthafen Bridge in Frankfurt/Main, Germany
    Springer, Johannes
    Dieter, Alwin
    Schidzig, Ruediger
    Kowalski, Peter
    STAHLBAU, 2014, 83 (10) : 722 - 730
  • [25] Tower building of the Commerzbank in Frankfurt/Main - planning, construction and erection
    Ladberg, Wilfried
    Stahlbau, 1996, 65 (10) : 356 - 367
  • [26] Construction process monitoring of space trusses
    School of Architecture and Civil Engineering, Taiyuan University of Technology, Taiyuan 030024, China
    Jianzhu Jiegou Xuebao, 2007, SUPPL. (142-146):
  • [27] Building process in spinel structure
    Oudet, X
    JOURNAL DE PHYSIQUE IV, 1997, 7 (C1): : 177 - 178
  • [28] View of Resuscitation for Wood Construction Building in China
    WANG Kai ZHAO Rongjun PAN HailiChinese Academy of Forestry
    ChineseForestryScienceandTechnology, 2005, (03) : 63 - 69
  • [29] Energy saving in building construction in China: A review
    Yang, Z
    Liu, B
    Zhao, HB
    INTERNATIONAL JOURNAL OF GREEN ENERGY, 2004, 1 (02) : 209 - 225
  • [30] Construction Method of Port Building Structure Joint Reinforcement of Port Building Structure
    Zhang, Xin
    Yang, Yong
    Yang, Zhaopeng
    Zheng, Yan
    JOURNAL OF COASTAL RESEARCH, 2020, : 422 - 425