The Electrical Ground Support Equipment for the ExoMars 2016 DREAMS scientific instrument

被引:0
|
作者
Molfese, C. [1 ]
Schipani, P. [1 ]
Marty, L. [1 ]
Esposito, F. [1 ]
D'Orsi, S. [1 ]
Mannetta, M. [1 ]
Debei, S. [2 ]
Bettanini, C. [2 ]
Aboudan, A. [2 ]
Colombatti, G. [2 ]
Mugnuolo, R. [3 ]
Marchetti, E. [3 ]
Pirrotta, S. [3 ]
机构
[1] INAF Osservatorio Astron Capodimonte, Naples, Italy
[2] CISAS, Padua, Italy
[3] Italian Space Agcy AST, Rome, Italy
关键词
EGSE; ExoMars; 2016; Mars; Space Payload; Test Equipment;
D O I
10.1117/12.2054641
中图分类号
P1 [天文学];
学科分类号
0704 ;
摘要
This paper describes the Electrical Ground Support Equipment (EGSE) of the Dust characterization, Risk assessment, and Environment Analyser on the Martian Surface (DREAMS) scientific instrument, an autonomous surface payload package to be accommodated on the Entry, Descendent and landing Module (EDM) of the ExoMars 2016 European Space Agency (ESA) mission. DREAMS will perform several kinds of measurements, such as the solar irradiance with different optical detectors in the UVA band (315-400nm), NIR band (700-1100nm) and in "total luminosity" (200 -1100 nm). It will also measure environmental parameters such as the intensity of the electric field, temperature, pressure, humidity, speed and direction of the wind. The EGSE is built to control the instrument and manage the data acquisition before the integration of DREAMS within the Entry, Descendent and landing Module (EDM) and then to retrieve data from the EDM Central Checkout System (CCS), after the integration. Finally it will support also the data management during mission operations. The EGSE is based on commercial off-the-shelf components and runs custom software. It provides power supply and simulates the spacecraft, allowing the exchange of commands and telemetry according to the protocol defined by the spacecraft prime contractor. This paper describes the architecture of the system, as well as its functionalities to test the DREAMS instrument during all development activities before the ExoMars 2016 launch.
引用
收藏
页数:6
相关论文
共 50 条
  • [41] PUBLIC RELATIONS ASPECTS OF GROUND SUPPORT EQUIPMENT
    WILLIAMS, PL
    HANCHETT, HK
    SAE TRANSACTIONS, 1967, 75 : 141 - &
  • [42] INTEGRATED SPACE VEHICLE GROUND SUPPORT EQUIPMENT
    RADCLIFF.FR
    RAY, JM
    JOURNAL OF SPACECRAFT AND ROCKETS, 1969, 6 (08) : 942 - &
  • [43] Intelligent Decision Support in the Electrical Equipment Diagnostics
    Eltyshev, D. K.
    Boyarshinova, V. V.
    PROCEEDINGS OF THE XIX IEEE INTERNATIONAL CONFERENCE ON SOFT COMPUTING AND MEASUREMENTS (SCM 2016), 2016, : 157 - 160
  • [44] Digital twin technology as an instrument for increasing electrical equipment reliability
    Khalyasmaa, A. I.
    Eroshenko, S. A.
    Shatunova, D. V.
    Larionova, A. A.
    Egorov, A. O.
    4TH INTERNATIONAL CONFERENCE ON RELIABILITY ENGINEERING (ICRE 2019), 2020, 836
  • [45] AIR CARGO HANDLING - ASSOCIATED GROUND SUPPORT EQUIPMENT
    WALLACE, SR
    SAE TRANSACTIONS, 1966, 74 : 89 - &
  • [46] AIRPORT COMPATIBILITY WITH SST - PROBLEMS OF GROUND SUPPORT EQUIPMENT
    MCDONALD, JF
    SAE TRANSACTIONS, 1966, 74 : 90 - &
  • [47] COTS ground support equipment - a manufacturer's experience
    Drudy, DP
    GROUND SUPPORT EQUIPMENT IN THE 21ST CENTURY, 2001, 2001 (02): : 13 - 23
  • [48] VANDENBERG GROUND SUPPORT EQUIPMENT FOR THE SPACE-SHUTTLE
    BERRIER, DJ
    JOURNAL OF SPACECRAFT AND ROCKETS, 1982, 19 (02) : 179 - 184
  • [49] Satellite and Ground Support Equipment for Space Solar Telescope
    Lu Chang
    AerospaceChina, 2003, (03) : 15 - 19
  • [50] QUANTIFICATION MODEL OF AIRPORT GROUND SUPPORT EQUIPMENT EMISSIONS
    Sznajderman, Lucas
    Coppa, Matias
    Martiarena, Juan F.
    Olariaga, Oscar Diaz
    AVIATION, 2022, 26 (04) : 195 - 208