Modified Shewhart charts for high yield processes

被引:18
|
作者
Chang, Tee Chin [1 ]
Gan, Fah Fatt
机构
[1] GlaxoSmithKline, Singapore, Singapore
[2] Natl Univ Singapore, Singapore 117548, Singapore
关键词
average run length; binomial counts; parts-per-million non-conforming items; supplementary runs rules; statistical process control;
D O I
10.1080/02664760701546279
中图分类号
O21 [概率论与数理统计]; C8 [统计学];
学科分类号
020208 ; 070103 ; 0714 ;
摘要
The conventional Shewhart p or np chart is not effective for monitoring a high yield process, a process in which the defect level is close to zero. An improved Shewhart np chart for monitoring high yield processes is proposed. A review of control charts for monitoring high yield processes is first given. The run length performance of the proposed Shewhart chart is then compared with other high yield control charts. A simple procedure for designing the chart for processes subjected to sampling or 100% continuous inspection is provided and this allows the chart to be implemented easily on the factory floor. The practical aspects of implementation of the Shewhart chart are discussed. An application of the Shewhart chart based on a real data set is demonstrated.
引用
收藏
页码:857 / 877
页数:21
相关论文
共 50 条
  • [31] SHEWHART-TYPE CHARTS IN NONSTANDARD SITUATIONS
    ROES, KCB
    DOES, RJMM
    TECHNOMETRICS, 1995, 37 (01) : 15 - 24
  • [32] The combined Shewhart-EWMA sign charts
    Shanshool, Mohammed Kadhim
    Mahadik, Shashibhushan B.
    Godase, Dadasaheb G.
    Khoo, Michael B. C.
    QUALITY AND RELIABILITY ENGINEERING INTERNATIONAL, 2024, 40 (07) : 4111 - 4122
  • [33] Estimation in Shewhart control charts: effects and corrections
    Albers, W
    Kallenberg, WCM
    METRIKA, 2004, 59 (03) : 207 - 234
  • [35] A unified approach to adaptive Shewhart control charts
    Mahadik, Shashibhushan B.
    COMMUNICATIONS IN STATISTICS-THEORY AND METHODS, 2017, 46 (20) : 10272 - 10293
  • [36] Estimation in Shewhart control charts: effects and corrections
    Willem Albers
    Wilbert C.M. Kallenberg
    Metrika, 2004, 59 : 207 - 234
  • [37] Improving the efficiency of various Shewhart control charts
    Khan, Nasrullah
    Aslam, Muhammad
    Lee, Hyeseon
    Ahmad, Liaquat
    Jun, Chi-Hyuck
    JOURNAL OF STATISTICS & MANAGEMENT SYSTEMS, 2021, 24 (08): : 1785 - 1800
  • [38] Run length analysis of Shewhart charts applied to drifting processes under an integrative SPC/EPC model
    Göb, R
    Del Castillo, E
    Dräger, K
    METRIKA, 1999, 50 (02) : 137 - 161
  • [39] Comparisons of Shewhart-type rank based control charts for monitoring location parameters of univariate processes
    Mukherjee, Amitava
    Sen, Rudra
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2015, 53 (14) : 4414 - 4445
  • [40] Shewhart control charts for dispersion adjusted for parameter estimation
    Goedhart, Rob
    da Silva, Michele M.
    Schoonhoven, Marit
    Epprecht, Eugenio K.
    Chakraborti, Subha
    Does, Ronald J. M. M.
    Veiga, Alvaro
    IISE TRANSACTIONS, 2017, 49 (08) : 838 - 848