共 50 条
- [32] Constrained scheduling of the inspection activities on semiconductor wafers grouped in families with sequence-dependent set-up times The International Journal of Advanced Manufacturing Technology, 2010, 46 : 695 - 705
- [33] Solution Approach for Solving Multi-Objective Single-Machine Problem with Sequence-Dependent Setup Times and Setup Costs INDUSTRIAL ENGINEERING AND MANAGEMENT SYSTEMS, 2019, 18 (04): : 735 - 747
- [36] Constrained scheduling of the inspection activities on semiconductor wafers grouped in families with sequence-dependent set-up times INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2010, 46 (5-8): : 695 - 705
- [37] Multi-objective Algorithms for the Single Machine Scheduling Problem with Sequence-dependent Family Setups 2012 31ST INTERNATIONAL CONFERENCE OF THE CHILEAN COMPUTER SCIENCE SOCIETY (SCCC 2012), 2012, : 142 - 151
- [39] MULTI-OBJECTIVE UNRELATED PARALLEL MACHINES SCHEDULING WITH SEQUENCE-DEPENDENT SETUP TIMES AND PRECEDENCE CONSTRAINTS INTERNATIONAL JOURNAL OF ENGINEERING, 2008, 21 (03): : 269 - 278