Cost-benefit analysis and large-scale infrastructure projects: state of the art and challenges

被引:66
|
作者
Vickerman, Roger [1 ]
机构
[1] Univ Kent, Ctr European Reg & Transport Econ, Canterbury CT2 7NP, Kent, England
来源
关键词
D O I
10.1068/b32112
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
In this paper I review the problems surrounding the use of cost-benefit analysis (CBA) in the appraisal of large-scale infrastructure projects. I define the requirements of a best-practice transport CBA and show the difficulties in achieving these for large-scale projects. The main difficulties discussed are those of forecasting over long time periods, dealing with imperfect competition in transport-using sectors to obtain estimations of wider transport benefits, introducing private finance and appraising network effects. I conclude that CBA can remain a valuable tool as part of the appraisal process but that the inputs to a CBA have to be carefully assessed, and complementary approaches, such as computable general equilibrium modelling, have a useful role to play for very large or network projects.
引用
收藏
页码:598 / 610
页数:13
相关论文
共 50 条