Using a Combined Intuitionistic Fuzzy Set-TOPSIS Method for Evaluating Project and Portfolio Management Information Systems

被引:0
|
作者
Gerogiannis, Vassilis C. [1 ,2 ]
Fitsilis, Panos [1 ,2 ]
Kameas, Achilles D. [2 ]
机构
[1] Technol Educ Inst Larissa, Project Management Dept, Larisa 41110, Hellas, Greece
[2] Hellen Open Univ, Patras 26222, Greece
关键词
Project and Portfolio Management Information Systems; Multi-Criteria Decision Making; Group Decision Making; TOPSIS; Intuitionistic Fuzzy Sets; GROUP DECISION-MAKING; ANALYTIC HIERARCHY PROCESS; AGGREGATION OPERATORS; SELECTION; SOFTWARE;
D O I
暂无
中图分类号
TP18 [人工智能理论];
学科分类号
081104 ; 0812 ; 0835 ; 1405 ;
摘要
Contemporary Project and Portfolio Management Information Systems (PPMIS) have embarked from single-user, single-project management systems to web-based, collaborative, multi-project, multi-functional information systems which offer organization-wide management support. The variety of offered functionalities along with the variation among each organization needs and the plethora of PPMIS available in the market, make the selection of a proper PPMIS a difficult, multi-criteria decision problem. The problem complexity is further augmented since the multi stakeholders involved cannot often rate precisely their preferences and the performance of candidate PPMIS on them. To meet these challenges, this paper presents a PPMIS selection/evaluation approach that combines TOPSIS (Technique for Order Preference by Similarity to Ideal Solution) with intuitionistic fuzzy group decision making. The approach considers the vagueness of evaluators' assessments when comparing PPMIS and the uncertainty of users to judge their needs.
引用
收藏
页码:67 / +
页数:3
相关论文
共 50 条
  • [21] Indexing of Information Systems Using Intuitionistic Rough Fuzzy Groups with Intuitionistic Fuzzy Decision Attributes
    Krishnaveni, B.
    Chandrika, S.
    Ganesan, G.
    SMART TRENDS IN INFORMATION TECHNOLOGY AND COMPUTER COMMUNICATIONS, SMARTCOM 2016, 2016, 628 : 254 - 263
  • [22] Incremental updating fuzzy tolerance rough set approach in intuitionistic fuzzy information systems with fuzzy decision
    Wang, Lu
    Pei, Zheng
    Qin, Keyun
    Yang, Lei
    APPLIED SOFT COMPUTING, 2024, 151
  • [23] TOPSIS based Renewable-Energy-Source-Selection using Moderator Intuitionistic Fuzzy Set
    Joshi, Bhagawati Prasad
    Joshi, Navneet
    Gegov, Alexander
    INTERNATIONAL JOURNAL OF MATHEMATICAL ENGINEERING AND MANAGEMENT SCIENCES, 2023, 8 (05) : 979 - 990
  • [24] Generalized dominance rough set models for the dominance intuitionistic fuzzy information systems
    Zhang, Xiaoxia
    Chen, Degang
    Tsang, E. C. C.
    INFORMATION SCIENCES, 2017, 378 : 1 - 25
  • [25] Dominance-based rough set model in intuitionistic fuzzy information systems
    Huang, Bing
    Li, Hua-xiong
    Wei, Da-kuan
    KNOWLEDGE-BASED SYSTEMS, 2012, 28 : 115 - 123
  • [26] Attribute Reduction of Incomplete Information Systems: An Intuitionistic Fuzzy Rough Set Approach
    Singh, Shivani
    Shreevastava, Shivam
    Som, Tanmoy
    RECENT ADVANCES IN INTELLIGENT INFORMATION SYSTEMS AND APPLIED MATHEMATICS, 2020, 863 : 628 - 643
  • [27] A Framework to Evaluate Project Complexity Using the Fuzzy TOPSIS Method
    Jaber, Hadi
    Marie, Franck
    Vidal, Ludovic-Alexandre
    Sarigol, Ilkan
    Didiez, Lionel
    SUSTAINABILITY, 2021, 13 (06)
  • [28] Trapezium cloud TOPSIS method with interval-valued intuitionistic hesitant fuzzy linguistic information
    Joshi D.K.
    Kumar S.
    Granular Computing, 2018, 3 (2) : 139 - 152
  • [29] INFORMATION MEASURES BASED TOPSIS METHOD FOR MULTICRITERIA DECISION MAKING PROBLEM IN INTUITIONISTIC FUZZY ENVIRONMENT
    Mishra, A. Raj
    Rani, P.
    Jain, D.
    IRANIAN JOURNAL OF FUZZY SYSTEMS, 2017, 14 (06): : 41 - 63
  • [30] USING MULTICRITERIA ANALYSIS AND FUZZY LOGIC FOR PROJECT PORTFOLIO MANAGEMENT
    Agapito, Andrezza de Oliveira
    Dianin Vianna, Marcilene de Fatima
    Moratori, Patrick B.
    Vianna, Dalessandro Soares
    Mitacc Meza, Edwin Benito
    Matias, Italo de Oliveira
    BRAZILIAN JOURNAL OF OPERATIONS & PRODUCTION MANAGEMENT, 2019, 16 (02): : 347 - 357