An effective hybrid discrete grey wolf optimizer for the casting production scheduling problem with multi-objective and multi-constraint

被引:63
|
作者
Qin, Hongbin [1 ]
Fan, Pengfei [1 ]
Tang, Hongtao [1 ]
Huang, Pan [1 ]
Fang, Bo [1 ]
Pan, Shunfa [1 ]
机构
[1] Wuhan Univ Technol, Sch Mech & Elect Engn, Hubei Key Lab Digital Mfg, Wuhan 430070, Hubei, Peoples R China
基金
中国国家自然科学基金;
关键词
Casting production scheduling; Processing interval constraint; Job transportation time; Initialization strategy; Grey wolf optimizer; Improved tabu search; PARTICLE SWARM OPTIMIZATION; LOOP SUPPLY CHAIN; TABU SEARCH ALGORITHM; JOB-SHOP PROBLEM; GENETIC ALGORITHM; DIFFERENTIAL EVOLUTION; MEMETIC ALGORITHM; NETWORK DESIGN; SOLVE; MODEL;
D O I
10.1016/j.cie.2018.12.061
中图分类号
TP39 [计算机的应用];
学科分类号
081203 ; 0835 ;
摘要
Since there are some special constraints in a real foundry enterprise, including the limitation of starting time in some casting operations and the transportation time between two adjacent operations, processing interval constraint (PIC) and job transportation time (TIT) are introduced in this paper. With the consideration of PIC and JTT, a multi-objective casting production scheduling model is constructed to minimize makespan, the total production cost and the total delivery delay time. A hybrid discrete multi-objective grey wolf optimizer (HDMGWO) is developed to solve this model. An initialization strategy based on reducing job transportation time and processing time (RTP) are designed to improve the quality of initial population. A improved tabu search (ITS) algorithm is embedded into grey wolf optimizer (GWO) to overcome the premature convergence of the GWO. A modified search operator of GWO is designed to tackle discrete combinatorial optimization. A case example of the real foundry enterprise is illustrated to evaluate the effectiveness of proposed HDMGWO. Experimental results demonstrate that the proposed HDMGWO is superior in terms of the quality of solutions compared to five multi-objective algorithms. Real running in a casting ERP system verifies the applicability of the proposed scheduling model and the HDMGWO.
引用
收藏
页码:458 / 476
页数:19
相关论文
共 50 条
  • [31] Multi-Objective Design Optimization of a Bioinspired Underactuated Robotic Gripper Using Multi-Objective Grey Wolf Optimizer
    Mahanta, Golak Bihari
    Rout, Amruta
    Gunji, Balamurali
    Deepak, B. B. V. L.
    Biswal, Bibhuti Bhusan
    ADVANCES IN MECHANICAL ENGINEERING, ICRIDME 2018, 2020, : 1497 - 1509
  • [32] Multi-objective power scheduling problem in smart homes using grey wolf optimiser
    Sharif Naser Makhadmeh
    Ahamad Tajudin Khader
    Mohammed Azmi Al-Betar
    Syibrah Naim
    Journal of Ambient Intelligence and Humanized Computing, 2019, 10 : 3643 - 3667
  • [33] Multi-objective power scheduling problem in smart homes using grey wolf optimiser
    Makhadmeh, Sharif Naser
    Khader, Ahamad Tajudin
    Al-Betar, Mohammed Azmi
    Naim, Syibrah
    JOURNAL OF AMBIENT INTELLIGENCE AND HUMANIZED COMPUTING, 2019, 10 (09) : 3643 - 3667
  • [34] Multi-Objective Optimal Scheduling of a Microgrid Using Oppositional Gradient-Based Grey Wolf Optimizer
    Rajagopalan, Arul
    Nagarajan, Karthik
    Montoya, Oscar Danilo
    Dhanasekaran, Seshathiri
    Kareem, Inayathullah Abdul
    Perumal, Angalaeswari Sendraya
    Lakshmaiya, Natrayan
    Paramasivam, Prabhu
    ENERGIES, 2022, 15 (23)
  • [35] Multi-objective day-ahead scheduling of microgrids using modified grey wolf optimizer algorithm
    Javidsharifi, Mahshid
    Niknam, Taher
    Aghaei, Jamshid
    Mokryani, Geev
    Papadopoulos, Panagiotis
    JOURNAL OF INTELLIGENT & FUZZY SYSTEMS, 2019, 36 (03) : 2857 - 2870
  • [36] Multi-objective grey wolf optimizer based on reinforcement learning for distributed hybrid flowshop scheduling towards mass personalized manufacturing
    Chen, Xin
    Li, Yibing
    Wang, Lei
    Wang, Kaipu
    Guo, Jun
    Liu, Jie
    EXPERT SYSTEMS WITH APPLICATIONS, 2025, 264
  • [37] An efficient evolutionary grey wolf optimizer for multi-objective flexible job shop scheduling problem with hierarchical job precedence constraints
    Zhu, Zhenwei
    Zhou, Xionghui
    COMPUTERS & INDUSTRIAL ENGINEERING, 2020, 140
  • [38] Grey Wolf Optimizer with Multi Step Crossover for Bi-objective Job Shop Scheduling Problem
    Gunadiz, Safia
    Berrichi, Ali
    ADVANCES IN COMPUTING SYSTEMS AND APPLICATIONS, 2022, 513 : 261 - 272
  • [39] Stochastic Hybrid Discrete Grey Wolf Optimizer for Multi-Objective Disassembly Sequencing and Line Balancing Planning in Disassembling Multiple Products
    Guo, Xiwang
    Zhang, Zhiwei
    Qi, Liang
    Liu, Shixin
    Tang, Ying
    Zhao, Ziyan
    IEEE TRANSACTIONS ON AUTOMATION SCIENCE AND ENGINEERING, 2022, 19 (03) : 1744 - 1756
  • [40] Research on rush order insertion rescheduling problem under hybrid flow shop with multi-objective and multi-constraint
    He X.-M.
    Dong S.-H.
    Gongcheng Kexue Xuebao/Chinese Journal of Engineering, 2019, 41 (11): : 1450 - 1457