Group scheduling and due date assignment on a single machine

被引:34
|
作者
Li, Shisheng [2 ]
Ng, C. T. [1 ]
Yuan, Jinjiang [2 ]
机构
[1] Hong Kong Polytech Univ, Dept Logist & Maritime, Kowloon, Hong Kong, Peoples R China
[2] Zhengzhou Univ, Dept Math, Zhengzhou 450001, Henan, Peoples R China
关键词
Single-machine scheduling; Group technology; Due date assignment; Earliness-tardiness; DEPENDENT PROCESSING TIMES; COMMON; ENVIRONMENT; PENALTIES; EARLINESS; SETUP;
D O I
10.1016/j.ijpe.2010.12.023
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
We consider a single-machine scheduling problem involving both the due date assignment and job scheduling under a group technology environment. The jobs (orders) of customers are classified into groups according to their production similarities in advance. To achieve production efficiency and save time/money resource, all jobs of the same group are required to be processed contiguously on the machine. A sequence-independent setup time precedes the processing of each group. The due dates are assignable according to one of the following three due date assignment methods: FML-CON, FML-SLK and DIF, where FML-CON means that all jobs within the same group are assigned a common due date, FML-SLK means that all jobs within the same group are assigned an equal flow allowance, and DIF means that each job can be assigned a different due date with no restrictions. The goal is to determine an optimal combination of the due date assignment strategy and job schedule so as to minimize an objective function that includes earliness, tardiness, due date assignment and flow time costs. An O(n log n) time unified optimization algorithm is provided for all of the above three due date assignment methods. (C) 2010 Elsevier B.V. All rights reserved.
引用
收藏
页码:230 / 235
页数:6
相关论文
共 50 条
  • [31] Optimal due date assignment in multi-machine scheduling environments
    Shabtay, Dvir
    Steiner, George
    JOURNAL OF SCHEDULING, 2008, 11 (03) : 217 - 228
  • [32] Fabrication scheduling on a single machine with due date constraints
    Lin, BMT
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2002, 136 (01) : 95 - 105
  • [33] Scheduling with common due date assignment
    Gordon, V
    Proth, JM
    Finke, G
    Chu, CB
    ETFA 2001: 8TH IEEE INTERNATIONAL CONFERENCE ON EMERGING TECHNOLOGIES AND FACTORY AUTOMATION, VOL 1, PROCEEDINGS, 2001, : 553 - 557
  • [34] Scheduling Problems with Due Date Assignment
    Yin, Yunqiang
    Cheng, Shuenn-Ren
    Chiang, John Y.
    Chen, Jason C. H.
    Mao, Xuerong
    Wu, Chin-Chia
    DISCRETE DYNAMICS IN NATURE AND SOCIETY, 2015, 2015
  • [35] Due date assignment and scheduling: SLK, TWK and other due date assignment models
    Gordon, VS
    Proth, JM
    Chu, CB
    PRODUCTION PLANNING & CONTROL, 2002, 13 (02) : 117 - 132
  • [36] Single machine scheduling with slack due dates assignment
    Liu, Weiguo
    Hu, Xiangpei
    Wang, Xuyin
    ENGINEERING OPTIMIZATION, 2017, 49 (04) : 709 - 717
  • [37] Due date assignment in single machine with stochastic processing times
    Elyasi, Ali
    Salmasi, Nasser
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2013, 51 (08) : 2352 - 2362
  • [38] A Bicriterion Approach to Due Date Assignment Scheduling in Single-Machine with Position-Dependent Weights
    Sun, Xinyu
    Geng, Xin-Na
    Wang, Jiayin
    Liu, Tao
    ASIA-PACIFIC JOURNAL OF OPERATIONAL RESEARCH, 2023, 40 (02)
  • [39] Single-machine scheduling and slack due-date assignment with aging effect and deteriorating maintenance
    Suh-Jenq Yang
    Chou-Jung Hsu
    Dar-Li Yang
    Optimization Letters, 2012, 6 : 1855 - 1873
  • [40] Single-machine scheduling and slack due-date assignment with aging effect and deteriorating maintenance
    Yang, Suh-Jenq
    Hsu, Chou-Jung
    Yang, Dar-Li
    OPTIMIZATION LETTERS, 2012, 6 (08) : 1855 - 1873