Group scheduling and due date assignment on a single machine

被引:34
|
作者
Li, Shisheng [2 ]
Ng, C. T. [1 ]
Yuan, Jinjiang [2 ]
机构
[1] Hong Kong Polytech Univ, Dept Logist & Maritime, Kowloon, Hong Kong, Peoples R China
[2] Zhengzhou Univ, Dept Math, Zhengzhou 450001, Henan, Peoples R China
关键词
Single-machine scheduling; Group technology; Due date assignment; Earliness-tardiness; DEPENDENT PROCESSING TIMES; COMMON; ENVIRONMENT; PENALTIES; EARLINESS; SETUP;
D O I
10.1016/j.ijpe.2010.12.023
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
We consider a single-machine scheduling problem involving both the due date assignment and job scheduling under a group technology environment. The jobs (orders) of customers are classified into groups according to their production similarities in advance. To achieve production efficiency and save time/money resource, all jobs of the same group are required to be processed contiguously on the machine. A sequence-independent setup time precedes the processing of each group. The due dates are assignable according to one of the following three due date assignment methods: FML-CON, FML-SLK and DIF, where FML-CON means that all jobs within the same group are assigned a common due date, FML-SLK means that all jobs within the same group are assigned an equal flow allowance, and DIF means that each job can be assigned a different due date with no restrictions. The goal is to determine an optimal combination of the due date assignment strategy and job schedule so as to minimize an objective function that includes earliness, tardiness, due date assignment and flow time costs. An O(n log n) time unified optimization algorithm is provided for all of the above three due date assignment methods. (C) 2010 Elsevier B.V. All rights reserved.
引用
收藏
页码:230 / 235
页数:6
相关论文
共 50 条
  • [1] Group Scheduling and Due Date Assignment Without Restriction on a Single Machine
    Chen, Ying
    Cheng, Yongxi
    ADVANCES IN PRODUCTION MANAGEMENT SYSTEMS: ARTIFICIAL INTELLIGENCE FOR SUSTAINABLE AND RESILIENT PRODUCTION SYSTEMS (APMS 2021), PT III, 2021, 632 : 250 - 257
  • [2] Single machine scheduling with common due date assignment in a group technology environment
    Chen, DW
    Li, S
    Tang, GC
    MATHEMATICAL AND COMPUTER MODELLING, 1997, 25 (03) : 81 - 90
  • [3] Two due date assignment problems in scheduling a single machine
    Shabtay, Dvir
    Steiner, George
    OPERATIONS RESEARCH LETTERS, 2006, 34 (06) : 683 - 691
  • [4] A Single Machine Group Scheduling Problem with Due Date Assignment and Position-Dependent Costs
    Chen, Ying
    Xu, Yi
    Zhang, Guiqing
    Cheng, Yongxi
    ASIA-PACIFIC JOURNAL OF OPERATIONAL RESEARCH, 2023, 40 (04)
  • [5] Optimization for Due-Date Assignment Single-Machine Scheduling under Group Technology
    Wang, Li-Yan
    Liu, Mengqi
    Wang, Ji-Bo
    Lu, Yuan-Yuan
    Liu, Wei-Wei
    COMPLEXITY, 2021, 2021
  • [6] Due-date assignment and single machine scheduling with deteriorating jobs
    Cheng, TCE
    Kang, L
    Ng, CT
    JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 2004, 55 (02) : 198 - 203
  • [7] Batch scheduling and common due-date assignment on a single machine
    Cheng, TCE
    Kovalyov, MY
    DISCRETE APPLIED MATHEMATICS, 1996, 70 (03) : 231 - 245
  • [8] Due date assignment and scheduling on a single machine with two competing agents
    Wang, Du-Juan
    Yin, Yunqiang
    Cheng, Shuenn-Ren
    Cheng, T. C. E.
    Wu, Chin-Chia
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2016, 54 (04) : 1152 - 1169
  • [9] Single Machine Due Date Assignment Scheduling with Deterioration and Learning Effect
    Liu, Weiwei
    Jiang, Chong
    PROCEEDINGS OF THE 11TH INTERNATIONAL CONFERENCE ON MODELLING, IDENTIFICATION AND CONTROL (ICMIC2019), 2020, 582 : 1271 - 1279
  • [10] Common due date assignment and cumulative deterioration scheduling on a single machine
    Li, Shi-Sheng
    Chen, Ren-Xia
    ENGINEERING OPTIMIZATION, 2017, 49 (06) : 976 - 989