PSO-Based Risk Allocation in Waste-To-Energy Incineration Public-Private Partnership model

被引:0
|
作者
Huang, Yang [1 ]
Han, Wenhua [1 ]
机构
[1] Shanghai Univ Elect Power, Coll Automat Engn, Shanghai, Peoples R China
关键词
Public-Private Partnership; Waste-To-Energy incineration projects; risk allocation ratio; altruistic preference; particle swarm optimization; SHARING RATIO;
D O I
10.1109/PSGEC51302.2021.9542605
中图分类号
X [环境科学、安全科学];
学科分类号
08 ; 0830 ;
摘要
Fair and reasonable risk sharing mechanism is beneficial to reduce the risk of investment and improve the economic benefits of Waste-To-Energy incineration projects project investment. In order to quantitatively study the risk allocation ratio of PPP Waste-To-Energy incineration projects, an intelligent optimization algorithm is used to solve the problem. Based on the utility model of government and enterprise, the risk sharing model is established by introducing the altruistic preference coefficient. In this paper the relationship between the altruistic preference coefficient, the risk-sharing ratio and the maximum utility value of government and firm qualitatively are studied. PSO algorithm is used to determine the altruistic preference coefficient, the government's risk-sharing ratio and the enterprise's effort.
引用
收藏
页码:502 / 506
页数:5
相关论文
共 50 条
  • [31] Waste Management Model Associated with Public-Private Partnership in Hamilton, Ontario, Canada
    Zhu, Jinxin
    Huang, Wendy
    Sun, Wei
    Huang, Gordon
    JOURNAL OF ENVIRONMENTAL ENGINEERING, 2016, 142 (03)
  • [32] A Public-Private Partnership Model for Obesity Prevention
    Huang, Terry T.
    Yaroch, Amy L.
    PREVENTING CHRONIC DISEASE, 2009, 6 (03):
  • [33] A bilevel planning model for public-private partnership
    Lavlinskii, S. M.
    Panin, A. A.
    Plyasunov, A. V.
    AUTOMATION AND REMOTE CONTROL, 2015, 76 (11) : 1976 - 1987
  • [34] A Public-Private Partnership Model for National Cybersecurity
    Shore, Malcolm
    Du, Yi
    Zeadally, Sherali
    POLICY AND INTERNET, 2011, 3 (02):
  • [35] Exploring Critical Factors for Achieving Successful Risk Allocation in Public-Private Partnership Projects
    Jin, Xiaohua
    Zuo, Jian
    Zhang, Guomin
    PROCEEDINGS OF 2010 INTERNATIONAL CONFERENCE ON CONSTRUCTION AND REAL ESTATE MANAGEMENT, VOLS 1-3, 2010, : 253 - 257
  • [36] Risk allocation in a public-private partnership: a case study of construction and operation of kindergartens in Kazakhstan
    Mouraviev, Nikolai
    Kakabadse, Nada K.
    JOURNAL OF RISK RESEARCH, 2014, 17 (05) : 621 - 640
  • [37] Review of studies on risk allocation and sharing in public-private partnership projects for infrastructure delivery
    Mazher, Khwaja Mateen
    FRONTIERS IN BUILT ENVIRONMENT, 2025, 11
  • [38] Risk Allocation Preferences in Indonesian Electricity Public-Private Partnership Projects: A Conjoint Analysis
    Hartono B.
    Ghifari M.D.A.
    Dianita O.
    Hartono, Budi (boed@gadjahmada.edu), 1600, Institute of Electrical and Electronics Engineers Inc. (49): : 154 - 174
  • [39] Revenue Risk Allocation Mechanism in Public-Private Partnership Projects: Swing Option Approach
    Zhang, Shuhua
    Li, Jinghuan
    Li, Yu
    Zhang, Xiaoling
    JOURNAL OF CONSTRUCTION ENGINEERING AND MANAGEMENT, 2021, 147 (01)
  • [40] Risk allocation, transfer and management in public-private partnership and private finance initiatives: a systematic literature review
    Tallaki, Mouhcine
    Bracci, Enrico
    INTERNATIONAL JOURNAL OF PUBLIC SECTOR MANAGEMENT, 2021, 34 (07) : 709 - 731