Fabrication and thermal cycle testing of a first wall mock-up for ITER baffle blanket module

被引:0
|
作者
Hatano, T [1 ]
Suzuki, S [1 ]
Yokoyama, K [1 ]
Akiba, M [1 ]
Ohmori, J [1 ]
Kuroda, T [1 ]
Takatsu, H [1 ]
机构
[1] Japan Atom Energy Res Inst, Naka Fus Res Estab, Naka, Ibaraki 3100193, Japan
来源
FUSION TECHNOLOGY | 1998年 / 34卷 / 03期
关键词
D O I
10.13182/FST98-A11963728
中图分类号
TL [原子能技术]; O571 [原子核物理学];
学科分类号
0827 ; 082701 ;
摘要
The objective of this study is to develop joining technology of a plasma facing CFC armor and DSCu heat sink by means of Ag-free brazing and to evaluate its performances under repeated high heat flux. For fabrication of a baffle first wall (FW) composed of dispersion strengthened copper (DSCu) as heat sink and carbon fiber composite (CFC) as amor material, a two-step brazing has been proposed. CFC armor tiles were joined to an oxygen free copper (OFCu) plate in the first step and the OFCu plates joined, in turn, to the DSCu heat sink in the second step. After screening tests, brazing materials of Cu-Mn and Al were selected for the first and the second steps, respectively. A small scale baffle FW mock-up of 400 mm in length, 49 mm in width and 52 mm in thickness was successfully fabricated. By destructive test of a piece with the same materials bonded under the same condition as the mock-up, bondability at each brazing interface was confirmed. Thermal cycle tests were performed with the fabricated mock-up. Test conditions were selected based on thermo-mechanical analyses to simulate the temperature at the brazing interface under ITER operation condition and also higher temperatures with higher heat fluxes for acceleration of thermal cycle tests. The mock-up withstood more than 4600 cycles with heat fluxes of 5-10 MW/m(2). From results of the thermal cycle tests, the integrity of CFC/DSCu interface was demonstrated.
引用
收藏
页码:908 / 913
页数:6
相关论文
共 50 条
  • [21] Development and validation of the blanket First Wall mock-up model in RELAP5-3D
    Di Marcello, Valentino
    Ghidersa, Bradut-Eugen
    Jin, Xue Zhou
    Abou-Sena, Ali
    Stieglitz, Robert
    FUSION ENGINEERING AND DESIGN, 2018, 136 : 1534 - 1539
  • [22] Fabrication of full-size mock-up for 10° section of ITER vacuum vessel thermal shield
    Kang, Dong Kwon
    Nam, Kwanwoo
    Kang, Kyoung-O
    Noh, Chang Hyun
    Chung, Wooho
    Lim, Kisuk
    Kang, Youngkil
    Hamlyn-Harris, Craig
    Her, Namil
    Robby, Hicks, III
    FUSION ENGINEERING AND DESIGN, 2015, 98-99 : 1566 - 1570
  • [23] Optimization and adjustment of impact set-up for testing of insulated pads of ITER blanket module connectors and first wall
    Kolganov, V
    Poddubnyi, I
    Timofeev, S.
    Sviridenko, M.
    Razmerov, A.
    Strebkov, Yu
    Danilov, I
    Khomiakov, S.
    Parshutin, E.
    Malyshev, A.
    Tagiev, R.
    Putrik, A.
    Safronov, V
    Egorov, K.
    Eaton, R.
    Raffray, R.
    FUSION ENGINEERING AND DESIGN, 2019, 146 : 2474 - 2478
  • [24] Beryllium/ferritic martensitic steel joining for the fabrication of the ITER test blanket module first wall
    Lee, Jung-Suk
    Park, Jeong-Yong
    Choi, Byung-Kwon
    Lee, Dong-Won
    Hong, Bong-Guen
    Jeong, Yong-Hwan
    FUSION ENGINEERING AND DESIGN, 2009, 84 (7-11) : 1170 - 1173
  • [25] Fabrication results of full scale mock-up for ITER W port in Korea
    Kim, H. S.
    Park, C. K.
    Kim, G. H.
    Hong, K. H.
    Lee, Y. J.
    Kim, B. C.
    Ahn, H. J.
    Lee, H. G.
    Kim, T. S.
    Lee, J. S.
    Won, J. G.
    Sa, J. W.
    Choi, C. H.
    FUSION ENGINEERING AND DESIGN, 2014, 89 (7-8) : 1779 - 1783
  • [26] FABRICATION AND INTEGRITY TESTING OF A KOREAN ITER TBM FW MOCK-UP IN PREPARATION FOR HIGH HEAT FLUX TEST
    Yoon, Jae Sung
    Kim, Suk Kwon
    Lee, Eo Hwak
    Cho, Seungyon
    Lee, Dong Won
    FUSION SCIENCE AND TECHNOLOGY, 2013, 64 (03) : 657 - 661
  • [27] Fabrication of a full-size mock-up for inboard 10° section of ITER vacuum vessel thermal shield
    Chung, W.
    Nam, K.
    Noh, C. H.
    Kang, D. K.
    Kang, S. M.
    Oh, Y. G.
    Choi, S. W.
    Kang, S. H.
    Utin, Y.
    Ioki, K.
    Her, N.
    Yu, J.
    FUSION ENGINEERING AND DESIGN, 2011, 86 (9-11) : 1928 - 1932
  • [28] Measurement and analysis of neutron flux spectra in a neutronics mock-up of the HCLL test blanket module
    Klix, A.
    Batistoni, P.
    Boettger, R.
    Lebrun-Grandie, D.
    Fischer, U.
    Henniger, J.
    Leichtle, D.
    Villari, R.
    FUSION ENGINEERING AND DESIGN, 2010, 85 (10-12) : 1803 - 1806
  • [29] THERMAL-HYDRAULIC AND STRUCTURAL ANALYSIS OF A HELIUM-COOLED FIRST WALL MOCK-UP
    Bonelli, F.
    Boccaccini, L. V.
    Ghidersa, B-E.
    Kang, Q.
    Savoldi, L.
    Zanino, R.
    FUSION SCIENCE AND TECHNOLOGY, 2015, 68 (03) : 507 - 511
  • [30] Fabrication of Be/CuCrZr/SS mock-ups for ITER first wall
    Park, Jeong-Yong
    Choi, Byung-Kwon
    Lee, Jung-Suk
    Lee, Dong Won
    Hong, Bong Guen
    Jeong, Yong Hwan
    FUSION ENGINEERING AND DESIGN, 2009, 84 (7-11) : 1468 - 1471