MIP approaches for the integrated berth allocation and quay crane assignment and scheduling problem

被引:119
|
作者
Agra, Agostinho [1 ,2 ]
Oliveira, Maryse [1 ]
机构
[1] Univ Aveiro, Dept Math, Aveiro, Portugal
[2] Univ Aveiro, Ctr Res & Dev Math & Applicat, Aveiro, Portugal
关键词
Berth allocation; Quay crane scheduling; Mixed integer formulations; Branch and cut; Rolling horizon heuristic; CONTAINER TERMINALS; PLANNING PROBLEM; ALGORITHM; PORT; BRANCH; MODELS; TIME;
D O I
10.1016/j.ejor.2017.05.040
中图分类号
C93 [管理学];
学科分类号
12 ; 1201 ; 1202 ; 120202 ;
摘要
In this paper we consider an integrated berth allocation and quay crane assignment and scheduling problem motivated by a real case where a heterogeneous set of cranes is considered. A first mathematical model based on the relative position formulation (RPF) for the berth allocation aspects is presented. Then, a new model is introduced to avoid the big-M constraints included in the RPF. This model results from a discretization of the time and space variables. For the new discretized model several enhancements, such as valid inequalities, are introduced. In order to derive good feasible solutions, a rolling horizon heuristic (RHH) is presented. A branch and cut approach that uses the enhanced discretized model and incorporates the upper bounds provided by the RHH solution is proposed. Computational tests are reported to show (i) the quality of the linear relaxation of the enhanced models; (ii) the effectiveness of the exact approach to solve to optimality a set of real instances; and (iii) the scalability of the RHH based on the enhanced mathematical model which is able to provide good feasible solutions for large size instances. (C) 2017 Elsevier B.V. All rights reserved.
引用
收藏
页码:138 / 148
页数:11
相关论文
共 50 条
  • [41] Development of Integrated Model For Continuous Berth Allocation Problem and Quay Crane Scheduling With Non Crossing Constraint
    Basri, Azyanzuhaila Hasan
    Zainuddin, Zaitul Marlizawati
    STATISTICS AND OPERATIONAL RESEARCH INTERNATIONAL CONFERENCE (SORIC 2013), 2014, 1613 : 113 - 121
  • [42] Combination of a Dynamic-Hybrid Berth Allocation Problem with a Quay Crane Scheduling Problem
    Alnaqbi, Bushra
    Alrubaiai, Hanan
    Al Alawi, Shaikha
    2016 7TH INTERNATIONAL CONFERENCE ON INFORMATION, INTELLIGENCE, SYSTEMS & APPLICATIONS (IISA), 2016,
  • [43] A genetic algorithm for robust berth allocation and quay crane assignment
    Rodriguez-Molins M.
    Ingolotti L.
    Barber F.
    Salido M.A.
    Sierra M.R.
    Puente J.
    Progress in Artificial Intelligence, 2014, 2 (4) : 177 - 192
  • [44] Improved formulations and an Adaptive Large Neighborhood Search heuristic for the integrated berth allocation and quay crane assignment problem
    Iris, Cagatay
    Pacino, Dario
    Ropke, Stefan
    TRANSPORTATION RESEARCH PART E-LOGISTICS AND TRANSPORTATION REVIEW, 2017, 105 : 123 - 147
  • [45] An optimization approach for coupling problem of berth allocation and quay crane assignment in container terminal
    Yang, Chunxia
    Wang, Xiaojun
    Li, Zhenfeng
    COMPUTERS & INDUSTRIAL ENGINEERING, 2012, 63 (01) : 243 - 253
  • [46] Discretization-Strategy-Based Solution for Berth Allocation and Quay Crane Assignment Problem
    Tang, Min
    Ji, Bin
    Fang, Xiaoping
    Yu, Samson S.
    JOURNAL OF MARINE SCIENCE AND ENGINEERING, 2022, 10 (04)
  • [47] Effect of Service Priority on the Integrated Continuous Berth Allocation and Quay Crane Assignment Problem after Port Congestion
    Tang, Shuang
    Xu, Sudong
    Gao, Jianwen
    Ma, Mengdi
    Liao, Peng
    JOURNAL OF MARINE SCIENCE AND ENGINEERING, 2022, 10 (09)
  • [48] A Multi-objective Genetic Algorithm for Berth Allocation and Quay Crane Assignment Problem
    Ji Xiaotao
    Du Yuquan
    Chen Qiushuang
    2011 CHINESE CONTROL AND DECISION CONFERENCE, VOLS 1-6, 2011, : 891 - 896
  • [49] Optimal berth allocation, time-variant quay crane assignment and scheduling with crane setups in container terminals
    Turkogullari, Yavuz B.
    Taskin, Z. Caner
    Aras, Necati
    Altinel, I. Kuban
    EUROPEAN JOURNAL OF OPERATIONAL RESEARCH, 2016, 254 (03) : 985 - 1001
  • [50] Berth and quay crane allocation: a moldable task scheduling model
    Blazewicz, J.
    Cheng, T. C. E.
    Machowiak, M.
    Oguz, C.
    JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 2011, 62 (07) : 1189 - 1197