共 50 条
- [48] Single-Machine Scheduling Problems with Two Agents Competing for Makespan LIFE SYSTEM MODELING AND INTELLIGENT COMPUTING, PT I, 2010, 6328 : 244 - 255
- [50] Single-machine scheduling with periodic maintenance to minimize makespan revisited Journal of Scheduling, 2014, 17 : 263 - 270