Understanding Demand for Project Manager Competences in the Construction Industry: Data Mining Approach

被引:29
|
作者
Zheng, Junping [1 ]
Wen, Qi [1 ,2 ]
Qiang, Maoshan [1 ]
机构
[1] Tsinghua Univ, State Key Lab Hydrosci & Engn, Inst Project Management & Construct Technol, Zhongguancun St, Beijing 100084, Peoples R China
[2] MIT, Ctr Collect Intelligence, 1st St, Cambridge, MA 02142 USA
基金
中国国家自然科学基金;
关键词
Project manager competences; Construction industry; Data mining; Industry demand; MODEL; PROFESSIONALS; EDUCATION; SECTOR; TEXT;
D O I
10.1061/(ASCE)CO.1943-7862.0001865
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Construction project managers (CPMs) are highly in demand in the construction industry, but this has not yet comprehensively been studied from a demand-side perspective. This study investigated the real-world demand for CPMs' competences by mining the big data of job advertisements. Using a large data set of 243,521 job advertisements that covered nearly the whole online job market for CPMs in China over 1 year, we tracked the demands for CPM competences at the industry level. A structural topic model (STM), a text-mining method, was used to analyze the descriptions of the CPM competences requirements to identify the major competences dimensions emphasized in the advertisements. The results suggest that there are eight major competences dimensions that recruiters expect from CPMs. Compared with relatively smaller firms, larger firms place more emphasis on construction site management, project objective monitoring, and organizational management capability. Compared with public firms, private firms prefer coordination and communication, external stakeholder management, and organizational management capability. Cluster analysis of job advertisements further suggested that there are five major types of CPMs, each of which specializes in only a few competences instead of being competent in all aspects. These findings revealed the real-world demands for CPMs and provided theoretical implications for developing a CPM competences framework from a realistic demand-side perspective. The findings also can be utilized to assist construction firms in formulating more-informed recruiting strategies and to help practitioners benchmark their own competences with industry demands.
引用
收藏
页数:14
相关论文
共 50 条
  • [41] A data mining approach for estimating patient demand for mental health services
    Kudyba, Stephan
    Perry, Thad
    HEALTH SYSTEMS, 2015, 4 (01) : 5 - 11
  • [42] A Framework for Baseline Load Estimation in Demand Response: Data Mining Approach
    Park, Saehong
    Ryu, Seunghyoung
    Choi, Yohwan
    Kim, Hongseok
    2014 IEEE INTERNATIONAL CONFERENCE ON SMART GRID COMMUNICATIONS (SMARTGRIDCOMM), 2014, : 638 - 643
  • [43] Trajectory Data Analysis in Support of Understanding Movement Patterns: A Data Mining Approach
    Rizk, Aya
    Elragal, Ahmed
    AMCIS 2012 PROCEEDINGS, 2012,
  • [44] What are the occupational hazards of construction project managers: A data mining analysis in China
    Li, Xiaodong
    Fei, Yifan
    Rizzuto, Tracey E.
    Yang, Fan
    SAFETY SCIENCE, 2021, 134
  • [45] A data mining approach to the joint evaluation of field and manufacturing data in automotive industry
    Strobel, Christian Manuel
    Hrycej, Tomas
    KNOWLEDGE DISCOVERY IN DATABASES: PKDD 2006, PROCEEDINGS, 2006, 4213 : 625 - 632
  • [46] Research and application of data mining technology on construction project cost control system
    Zhou, Ying
    Ding, Lie Yun
    Proceedings of CRIOCM 2006 International Research Symposium on Advancement of Construction Management and Real Estate, Vols 1 and 2, 2006, : 471 - 476
  • [47] Analysis of knowledge data discovery and mining by construction of natural language understanding system
    Wang, QiuFen
    Guo, HuiLing
    PROCEEDINGS OF THE INTERNATIONAL CONFERENCE ON EDUCATION, MANAGEMENT, COMMERCE AND SOCIETY, 2015, 17 : 640 - 644
  • [48] Data mining approach to internal fraud in a project-based organization
    Bach, Mirjana Pejic
    Dumicic, Ksenija
    Zmuk, Berislav
    Curlin, Tamara
    Zoroja, Jovana
    IJISPM-INTERNATIONAL JOURNAL OF INFORMATION SYSTEMS AND PROJECT MANAGEMENT, 2020, 8 (02): : 81 - 101
  • [49] Identification of the Barriers to Data-Centric Approach in the Construction Industry
    Karji, Ali
    Messner, John
    Leicht, Robert
    McComb, Christopher
    CONSTRUCTION RESEARCH CONGRESS 2022: PROJECT MANAGEMENT AND DELIVERY, CONTRACTS, AND DESIGN AND MATERIALS, 2022, : 1002 - 1011
  • [50] The practicalities of transferring data between project collaboration systems used by the construction industry
    Moses, S.
    El-Hamalawi, A.
    Hassan, T. M.
    AUTOMATION IN CONSTRUCTION, 2008, 17 (07) : 824 - 830