RETRACTED: Complex multi-products dynamic scheduling algorithm with sequence-dependent setup times (Retracted Article)

被引:1
|
作者
Xie, Zhiqiang [1 ,2 ]
Lan, Lan [1 ]
Zhao, Lei [1 ]
Yang, Jing [2 ]
机构
[1] Harbin Univ Sci & Technol, Coll Comp Sci & Technol, Harbin, Peoples R China
[2] Harbin Engn Univ, Coll Comp Sci & Technol, Harbin, Peoples R China
基金
中国国家自然科学基金; 中国博士后科学基金;
关键词
complex multi-products; setup times; integrated scheduling; algorithm; manufacturing tree;
D O I
10.1109/ICACC.2010.5486771
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
The problem of considering the setup times in scheduling with non-sequence constraint between operations has been researched, but there are no researches on the problem of considering the setup times in processing and assembly integrated scheduling of complex multi-product dynamic scheduling with sequence constraint between operations. So, a complex multi-product dynamic scheduling algorithm is proposed, considering sequence-dependent setup times. The algorithm constructs the virtual manufacturing tree in the way of root alignment and converts the complex multi-product dynamic scheduling problem to the complex single product scheduling problem. After the scheduling sequence of operations is determined, the starting time of each operation is determined by dynamically inserting setup time once. As the (1) proposed algorithm avoids several movements of the scheduled operation when the setup time is inserted, the time complexity is sharply reduced. Theoretical analysis and examples show that the proposed algorithm not only can solve the complex multi-product dynamic scheduling problem with sequence-dependent setup times, but also is simple and practical.
引用
收藏
页码:19 / 24
页数:6
相关论文
共 50 条
  • [41] Study on job shop scheduling with sequence-dependent setup times using biological immune algorithm
    Zhou, Yaqin
    Li, Beizhi
    Yang, Jianguo
    INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2006, 30 (1-2): : 105 - 111
  • [42] Study on job shop scheduling with sequence-dependent setup times using biological immune algorithm
    Zhou, Yaqin
    Li, Beizhi
    Yang, Jianguo
    International Journal of Advanced Manufacturing Technology, 2006, 30 (1-2): : 105 - 111
  • [43] Parallel Servers Scheduling with Dynamic Sequence-Dependent Setup Time
    Thanh-Cong Dinh
    Bae, Hyerim
    INTELLIGENT DECISION TECHNOLOGIES (IDT'2012), VOL 2, 2012, 16 : 79 - 87
  • [44] Study on job shop scheduling with sequence-dependent setup times using biological immune algorithm
    Yaqin Zhou
    Beizhi Li
    Jianguo Yang
    The International Journal of Advanced Manufacturing Technology, 2006, 30 : 105 - 111
  • [45] Symbiotic organisms search algorithm for the unrelated parallel machines scheduling with sequence-dependent setup times
    Ezugwu, Absalom E.
    Adeleke, Olawale J.
    Viriri, Serestina
    PLOS ONE, 2018, 13 (07):
  • [46] A simulated annealing algorithm approach to hybrid flow shop scheduling with sequence-dependent setup times
    H. S. Mirsanei
    M. Zandieh
    M. J. Moayed
    M. R. Khabbazi
    Journal of Intelligent Manufacturing, 2011, 22 : 965 - 978
  • [47] A Hybrid Genetic Algorithm for the Distributed Permutation Flowshop Scheduling Problem with Sequence-Dependent Setup Times
    Huang, Jiangping
    Pan, Quanke
    Chen, Qingda
    2019 3RD INTERNATIONAL CONFERENCE ON ARTIFICIAL INTELLIGENCE APPLICATIONS AND TECHNOLOGIES (AIAAT 2019), 2019, 646
  • [48] A simulated annealing algorithm approach to hybrid flow shop scheduling with sequence-dependent setup times
    Mirsanei, H. S.
    Zandieh, M.
    Moayed, M. J.
    Khabbazi, M. R.
    JOURNAL OF INTELLIGENT MANUFACTURING, 2011, 22 (06) : 965 - 978
  • [49] Dynamic job-shop scheduling with sequence-dependent setup times: simulation modeling and analysis
    Vinod, V.
    Sridharan, R.
    INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2008, 36 (3-4): : 355 - 372
  • [50] Dynamic job-shop scheduling with sequence-dependent setup times: Simulation modeling and analysis
    Vinod, V.
    Sridharan, R.
    International Journal of Advanced Manufacturing Technology, 2008, 36 (3-4): : 355 - 372