RETRACTED: Complex multi-products dynamic scheduling algorithm with sequence-dependent setup times (Retracted Article)

被引:1
|
作者
Xie, Zhiqiang [1 ,2 ]
Lan, Lan [1 ]
Zhao, Lei [1 ]
Yang, Jing [2 ]
机构
[1] Harbin Univ Sci & Technol, Coll Comp Sci & Technol, Harbin, Peoples R China
[2] Harbin Engn Univ, Coll Comp Sci & Technol, Harbin, Peoples R China
基金
中国国家自然科学基金; 中国博士后科学基金;
关键词
complex multi-products; setup times; integrated scheduling; algorithm; manufacturing tree;
D O I
10.1109/ICACC.2010.5486771
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
The problem of considering the setup times in scheduling with non-sequence constraint between operations has been researched, but there are no researches on the problem of considering the setup times in processing and assembly integrated scheduling of complex multi-product dynamic scheduling with sequence constraint between operations. So, a complex multi-product dynamic scheduling algorithm is proposed, considering sequence-dependent setup times. The algorithm constructs the virtual manufacturing tree in the way of root alignment and converts the complex multi-product dynamic scheduling problem to the complex single product scheduling problem. After the scheduling sequence of operations is determined, the starting time of each operation is determined by dynamically inserting setup time once. As the (1) proposed algorithm avoids several movements of the scheduled operation when the setup time is inserted, the time complexity is sharply reduced. Theoretical analysis and examples show that the proposed algorithm not only can solve the complex multi-product dynamic scheduling problem with sequence-dependent setup times, but also is simple and practical.
引用
收藏
页码:19 / 24
页数:6
相关论文
共 50 条
  • [1] A genetic algorithm for the batch scheduling with sequence-dependent setup times
    Chen, TsiuShuang
    Long, Lei
    Fung, Richard Y. K.
    INTELLIGENT COMPUTING IN SIGNAL PROCESSING AND PATTERN RECOGNITION, 2006, 345 : 1137 - 1144
  • [2] A bicriteria scheduling with sequence-dependent setup times
    Eren, Tamer
    Guner, Ertan
    APPLIED MATHEMATICS AND COMPUTATION, 2006, 179 (01) : 378 - 385
  • [3] Scheduling jobs on dynamic parallel machines with sequence-dependent setup times
    Zne-Jung Lee
    Shih-Wei Lin
    Kuo-Ching Ying
    The International Journal of Advanced Manufacturing Technology, 2010, 47 : 773 - 781
  • [4] A genetic algorithm for scheduling open shops with sequence-dependent setup times
    Abreu, Levi R.
    Cunha, Jesus O.
    Prata, Bruno A.
    Framinan, Jose M.
    COMPUTERS & OPERATIONS RESEARCH, 2020, 113
  • [5] Scheduling jobs on dynamic parallel machines with sequence-dependent setup times
    Lee, Zne-Jung
    Lin, Shih-Wei
    Ying, Kuo-Ching
    INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2010, 47 (5-8): : 773 - 781
  • [6] A discrete multi-objective fireworks algorithm for flowshop scheduling with sequence-dependent setup times
    He, Lijun
    Li, Wenfeng
    Zhang, Yu
    Cao, Yulian
    SWARM AND EVOLUTIONARY COMPUTATION, 2019, 51
  • [7] RETRACTED: An algorithm of confirming the processing sequence of complex multi-product (Retracted Article)
    Xie Zhiqiang
    Guo, Yukun
    Hu, Huoyan
    Yang, Jing
    Tan, Guangyu
    2009 INTERNATIONAL CONFERENCE ON COMPUTER MODELING AND SIMULATION, PROCEEDINGS, 2009, : 99 - +
  • [8] An ant colony algorithm for scheduling in flowshops with sequence-dependent setup times of jobs
    Gajpal, Yuvraj
    Rajendran, Chandrasekharan
    Ziegler, Hans
    INTERNATIONAL JOURNAL OF ADVANCED MANUFACTURING TECHNOLOGY, 2006, 30 (5-6): : 416 - 424
  • [9] A dynamic differential evolution algorithm for the dynamic single-machine scheduling problem with sequence-dependent setup times
    Zhao, Yue
    Wang, Gongshu
    JOURNAL OF THE OPERATIONAL RESEARCH SOCIETY, 2020, 71 (02) : 225 - 236
  • [10] Hybrid genetic algorithm for job shop scheduling with sequence-dependent setup times
    Zhou, H.
    Zhang, H.M.
    Hangkong Xuebao/Acta Aeronautica et Astronautica Sinica, 2001, 22 (02): : 180 - 183