Prediction of the number of consumed disc cutters of tunnel boring machine using intelligent methods

被引:7
|
作者
Afradi, Alireza [1 ]
Ebrahimabadi, Arash [2 ]
Hallajian, Tahereh [1 ]
机构
[1] Islamic Azad Univ, Dept Min & Geol, Qaemshahr Branch, Qaemshahr 4765161964, Iran
[2] Islamic Azad Univ, Dept Petr Min & Mat Engn, Cent Tehran Branch, Tehran 13117773591, Iran
来源
MINING OF MINERAL DEPOSITS | 2021年 / 15卷 / 04期
关键词
regression; gene expression programming; support vector machine; Sabzkooh water conveyance tunnel; ARTIFICIAL NEURAL-NETWORK; FRICTION FACTOR; SEDIMENT LOAD; PERFORMANCE; REGRESSION; ROCK; MODELS; SVM;
D O I
10.33271/mining15.04.068
中图分类号
TD [矿业工程];
学科分类号
0819 ;
摘要
Purpose. Disc cutters are the main cutting tools for the Tunnel Boring Machines (TBMs). Prediction of the number of consumed disc cutters of TBMs is one of the most significant factors in the tunneling projects. Choosing the right model for predicting the number of consumed disc cutters in mechanized tunneling projects has been the most important mechanized tunneling topics in recent years. Methods. In this research, the prediction of the number of consumed disc cutters considering machine and ground conditions such as Power (KW), Revolutions per minute (RPM) (Cycle/Min), Thrust per Cutter (KN), Geological Strength Index (GSI) in the Sabzkooh water conveyance tunnel has been conducted by multiple linear regression analysis and multiple nonlinear regression, Gene Expression Programming (GEP) method and Support Vector Machine (SVM) approaches. Findings. Results showed that the number of consumed disc cutters for linear regression method is R-2 = 0.95 and RMSE = 0.83, nonlinear regression method is - R-2 = 0.95 and RMSE = 0.84, Gene Expression Programming (GEP) method is - R-2 = 0.94 and RMSE = 0.95, Support Vector Machine (SVM) method is - R-2 = 0.98 and RMSE = 0.45. Originality. During the analyses, in order to evaluate the accuracy and efficiency of predictive models, the coefficient of determination (R-2) and root mean square error (RMSE) have been used. Practical implications. Results demonstrated that all four methods are effective and have high accuracy but the method of support vector machine has a special superiority over other methods.
引用
收藏
页码:68 / 74
页数:7
相关论文
共 50 条
  • [21] Disc cutters' layout design of the full-face rock tunnel boring machine (TBM) using a cooperative coevolutionary algorithm
    Sun, Wei
    Huo, Junzhou
    Chen, Jing
    Li, Zhen
    Zhang, Xu
    Guo, Li
    Zhao, Haifeng
    Zhao, Yu
    JOURNAL OF MECHANICAL SCIENCE AND TECHNOLOGY, 2011, 25 (02) : 415 - 427
  • [22] Disc cutters’ layout design of the full-face rock tunnel boring machine (TBM) using a cooperative coevolutionary algorithm
    Wei Sun
    Junzhou Huo
    Jing Chen
    Zhen Li
    Xu Zhang
    Li Guo
    Haifeng Zhao
    Yu Zhao
    Journal of Mechanical Science and Technology, 2011, 25
  • [23] Full-scale granite cutting experiments using tunnel boring machine disc cutters at different free-face conditions
    Xu, Huaguo
    Geng, Qi
    Sun, Zhenchuan
    Qi, Zhichong
    TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY, 2021, 108
  • [24] Transfer component analysis-driven domain adaptation approach for estimating the life of tunnel boring machine disc cutters
    Loy-Benitez, Jorge
    Lee, Hyun-Koo
    Song, Myung Kyu
    Choi, Yohyun
    Lee, Sean Seungwon
    TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY, 2024, 147
  • [25] Evaluating Stress Impact on Roller Bearing Within Disc Cutters of Tunnel Boring Machines
    Wang, T. N.
    Li, H. T.
    Wei, J. X.
    Fu, J. W.
    Haeri, H.
    Shangguan, L. J.
    STRENGTH OF MATERIALS, 2024, 56 (06) : 1179 - 1192
  • [26] From tunnel boring machine to tunnel boring robot: perspectives on intelligent shield machine and its smart operation
    Zhang, Yakun
    Gong, Guofang
    Yang, Huayong
    Li, Jianbin
    Jing, Liujie
    JOURNAL OF ZHEJIANG UNIVERSITY-SCIENCE A, 2024, 25 (05): : 357 - 381
  • [27] Optimal Disc Cutters Plane Layout Design of the Full-Face Rock Tunnel Boring Machine (TBM) Using an Ant Colony Optimization Algorithm
    Huo, Junzhou
    Sun, Wei
    Su, Pengcheng
    Deng, Liying
    INTELLIGENT ROBOTICS AND APPLICATIONS, PROCEEDINGS, 2009, 5928 : 443 - +
  • [28] Prediction of tunnel boring machine operating parameters using various machine learning algorithms
    Xu, Chen
    Liu, Xiaoli
    Wang, Enzhi
    Wang, Sijing
    Tunnelling and Underground Space Technology, 2021, 109
  • [29] Prediction of tunnel boring machine operating parameters using various machine learning algorithms
    Xu, Chen
    Liu, Xiaoli
    Wang, Enzhi
    Wang, Sijing
    TUNNELLING AND UNDERGROUND SPACE TECHNOLOGY, 2021, 109
  • [30] Disc cutters plane layout design of the full-face rock tunnel boring machine (TBM) based on different layout patterns
    Huo, Junzhou
    Sun, Wei
    Chen, Jing
    Zhang, Xu
    COMPUTERS & INDUSTRIAL ENGINEERING, 2011, 61 (04) : 1209 - 1225