The methodology behind the development of the Vera/Nancy mine

被引:0
|
作者
McKinstry, J [1 ]
机构
[1] Pajingo Joint Venture, Charters Towers, Qld 4820, Australia
来源
关键词
D O I
暂无
中图分类号
TD [矿业工程];
学科分类号
0819 ;
摘要
Within ten months of the first significant intersection on the Vera deposit, approval was given to proceed with a $28.3 M underground development of the Vera-Nancy gold mine. Contrary to what the timeframe suggests, the development of the underground mine was planned in a logical and methodical manner which enabled confirmation of the resource, evaluation of the orebody for mining and sufficient production to recommence milling operations at the Pajingo treatment plant. This paper describes the underlying factors on which the project was planned and developed. The approach has successfully enabled the mine to be in production Ig months after discovery without compromising any future production or potential expansion.
引用
收藏
页码:217 / 219
页数:3
相关论文
共 50 条
  • [21] Development and validation of the Nancy histological index for UC
    Marchal-Bressenot, Aude
    Salleron, Julia
    Boulagnon-Rombi, Camille
    Bastien, Claire
    Cahn, Virginie
    Cadiot, Guillaume
    Diebold, Marie-Daniele
    Danese, Silvio
    Reinisch, Walter
    Schreiber, Stefan
    Travis, Simon
    Peyrin-Biroulet, Laurent
    GUT, 2017, 66 (01) : 43 - 49
  • [22] Development and analysis of a methodology to generate operational open-pit mine ramp designs automatically
    Morales, Nelson
    Nancel-Penard, Pierre
    Espejo, Nelson
    OPTIMIZATION AND ENGINEERING, 2023, 24 (02) : 711 - 741
  • [23] Development and analysis of a methodology to generate operational open-pit mine ramp designs automatically
    Nelson Morales
    Pierre Nancel-Penard
    Nelson Espejo
    Optimization and Engineering, 2023, 24 : 711 - 741
  • [24] DEVELOPMENT OF A METHODOLOGY FOR STABILITY MONITORING OF A DEFENSE EMBANKMENT LOADED WITH FREQUENT TRAFFIC: THE EXAMPLE OF THE KOVIN MINE
    Srdan, Kostic
    Nebojsa, Nikolic
    Vladimir, Malbasic
    ARCHIVES FOR TECHNICAL SCIENCES, 2021, (25): : 29 - 42
  • [25] Leaving no one behind: a methodology for setting health inequality reduction targets for Sustainable Development Goal 3
    Sanhueza, Antonio
    Espinosa, Isabel
    Mujica, Oscar J.
    da Silva, Jarbas Barbosa, Jr.
    REVISTA PANAMERICANA DE SALUD PUBLICA-PAN AMERICAN JOURNAL OF PUBLIC HEALTH, 2021, 45 : 1 - 7
  • [26] Leaving no one behind: Methodology to set health inequality reduction targets for Sustainable Development Goal 3
    Sanhueza, Antonio
    Espinosa, Isabel
    Mujica, Oscar J.
    da Silva, Jarbas Barbosa, Jr.
    REVISTA PANAMERICANA DE SALUD PUBLICA-PAN AMERICAN JOURNAL OF PUBLIC HEALTH, 2020, 44
  • [27] Methodology for estimating the costs of treatment of mine drainage
    Rajaram, V
    Glazer, A
    Coghlan, G
    PROCEEDINGS OF THE SEVENTEENTH INTERNATIONAL MINING CONGRESS AND EXHIBITION OF TURKEY, 2001, : 191 - 201
  • [28] A methodology for design and simulation of mine ventilation networks
    Bernardo, PM
    daGama, CD
    PROCEEDINGS OF THE 6TH INTERNATIONAL MINE VENTILATION CONGRESS, 1997, : 395 - 402
  • [29] DEVELOPMENT BEHIND THE FOOTLIGHTS
    ACKERMANN, JM
    INTERNATIONAL DEVELOPMENT REVIEW, 1979, 21 (01) : 55 - 57
  • [30] The methodology for mine closure with geosynthetics applied in Brazil
    Todescan, Bruna
    Andrade, Leticia Toniato
    Caressato Junior, Wladimir, Jr.
    5TH PAN-AMERICAN CONFERENCE ON GEOSYNTHETICS, GEOAMERICAS 2024, 2024, 569