Heuristic planning for dynamic VAR compensation using zoning approach

被引:14
|
作者
Guan, Lin [1 ]
Wu, Liang [1 ]
Li, Feng [1 ]
Zhao, Qi [1 ]
机构
[1] South China Univ Technol, Sch Elect Power, Guangzhou, Guangdong, Peoples R China
基金
中国国家自然科学基金;
关键词
static VAr compensators; pattern clustering; wind power plants; power generation planning; voltage control; dynamic VAR compensation; zoning approach; high-voltage DC systems; clustering algorithm; renewable power plants; modern power system; heuristic planning method; DVC installation; dynamic behaviour correlation; voltage control ability; capacity optimisation; modified New England 39-bus test system; wind farm integration;
D O I
10.1049/iet-gtd.2016.2113
中图分类号
TM [电工技术]; TN [电子技术、通信技术];
学科分类号
0808 ; 0809 ;
摘要
Dynamic VAR compensation (DVC) is gaining increasing attentions with growing construction of high-voltage DC systems and renewable power plants in modern power system. This study proposes a novel zoning-based heuristic planning method to reduce the sites and capacity of DVC installation. Clustering algorithm based on buses' dynamic behaviour correlation and voltage control ability is developed to partition the system into several control zones. Then, candidate DVC sites are determined by zones, which narrow the searching space and avoid excessive installation of DVCs on adjacent buses. The voltage control index is proposed to find proper DVC installation locations by zones and capacity optimisation is then carried out to reduce investment. The proposed methodology is demonstrated on a modified New England 39-bus test system with wind farm integration. Performance comparison with conventional planning scheme confirms the advantages of the new heuristic planning scheme in practical applications.
引用
收藏
页码:2852 / 2861
页数:10
相关论文
共 50 条
  • [41] Spatial optimization for urban green space (UGS) planning support using a heuristic approach
    Li, Xin
    Li, Xiaoshun
    Ma, Xiaodong
    APPLIED GEOGRAPHY, 2022, 138
  • [42] Optimal VAR planning using facts
    Nandha Kumar, S.K. (nandhaaaa@gmail.com), 2012, Acta Press (32):
  • [43] Dynamic database approach for fault tolerant control using dual heuristic programming
    Yen, GG
    de Lima, PG
    PROCEEDINGS OF THE 2002 AMERICAN CONTROL CONFERENCE, VOLS 1-6, 2002, 1-6 : 5080 - 5085
  • [44] Solving Order Planning Problem Using a Heuristic Approach: The Case in a Building Material Distributor
    Wang, Chia-Nan
    Nguyen, Ngoc-Ai-Thy
    Dang, Thanh-Tuan
    APPLIED SCIENCES-BASEL, 2020, 10 (24): : 1 - 21
  • [45] Heuristic approach to robot path planning based on task requirements using a genetic algorithm
    Natl Chiao-Tung Univ, Hsinchu, Taiwan
    J Intell Rob Syst Theor Appl, 1 (65-88):
  • [46] Spatial optimization for urban green space (UGS) planning support using a heuristic approach
    Li, Xin
    Li, Xiaoshun
    Ma, Xiaodong
    APPLIED GEOGRAPHY, 2022, 138
  • [47] Motion Planning of Tree Fruit Robot Picker in Presence of Obstacles Using Heuristic Approach
    Rodic, Aleksandar
    Kljajic, Jelena
    18TH INTERNATIONAL SYMPOSIUM ON APPLIED COMPUTATIONAL INTELLIGENCE AND INFORMATICS, SACI 2024, 2024, : 467 - 472
  • [48] Dynamic Security Constrained VAR Planning for Competitive Environments
    Yorino, Naoto
    Eghbal, Mehdi
    El-Araby, E. E.
    Zoka, Yoshifumi
    2008 IEEE POWER & ENERGY SOCIETY GENERAL MEETING, VOLS 1-11, 2008, : 3564 - +
  • [49] A new heuristic and an exact approach for a production planning problem
    Peter Auer
    György Dósa
    Tibor Dulai
    Armin Fügenschuh
    Peggy Näser
    Ronald Ortner
    Ágnes Werner-Stark
    Central European Journal of Operations Research, 2021, 29 : 1079 - 1113
  • [50] A Heuristic Approach for Optimal Planning and Operation of Distribution Systems
    Alzaidi, Khalid Mohammed Saffer
    Bayat, Oguz
    Ucan, Osman N.
    JOURNAL OF OPTIMIZATION, 2018, 2018