Damage location of Runyang cable-stayed bridge based on BP neural network

被引:0
|
作者
Yang, Jie [1 ,2 ]
Li, Aiqun [1 ]
Miao, Changqing [1 ]
机构
[1] Southeast Univ, Coll Civil Engn, Nanjing, Jiangsu, Peoples R China
[2] Nanjing Univ Aeronaut & Astronaut, Dept Civil Engn, Nanjing, Jiangsu, Peoples R China
关键词
cable-stayed bridge; Back-Propagation neural network; damage location;
D O I
暂无
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
The damage location of long span bridge remains a challenge. This paper aims to develop a damage location method based on BP neural network to diagnose the cable damage of a long span cable-stayed bridge (Runyang North Bridge). First the damage patterns are defined based on plentiful dynamical calculation. The careful analysis of damage pattern reveals that the damage patterns caused by different damage location appear inherent distinctness, while the damage extent only linearly amplifies the damage pattern curves. And the fourth, sixth and seventh frequencies are canceled form the patterns because of the insensitiveness to cable damage. Then a Back-Propagation neural network is designed by trail and error to describe the 7 dimensions mapping space of damage pattern. Identification results prove that the properly organized Back-Propagation network could effectively grasp the damage pattern and identify the damage location correctly.
引用
收藏
页码:777 / +
页数:3
相关论文
共 50 条
  • [41] MONTREAL BOASTS CABLE-STAYED BRIDGE
    DEMERS, JG
    SIMONSEN, OF
    CIVIL ENGINEERING, 1971, 41 (08): : 59 - &
  • [42] Construction of the hybrid cable-stayed bridge
    Kim, D. G.
    Kwon, H. C.
    Lee, K. J.
    BRIDGE MAINTENANCE, SAFETY, MANAGEMENT AND LIFE-CYCLE OPTIMIZATION, 2010, : 3328 - 3333
  • [43] JAPANESE CABLE-STAYED BRIDGE DESIGN
    BURDEN, AR
    PROCEEDINGS OF THE INSTITUTION OF CIVIL ENGINEERS PART 1-DESIGN AND CONSTRUCTION, 1991, 90 : 1021 - 1051
  • [44] DYNAMIC BEHAVIOR OF A CABLE-STAYED BRIDGE
    FLEMING, JF
    EGESELI, EA
    EARTHQUAKE ENGINEERING & STRUCTURAL DYNAMICS, 1980, 8 (01): : 1 - 16
  • [45] Missouri Cable-Stayed Bridge Opens
    Goodwin, April
    Better Roads, 2004, 74 (02): : 94 - 97
  • [46] OPERATION AND MAINTENANCE OF CABLE-STAYED BRIDGE
    Tian Chunyan
    Yang Shengchao
    Zhang Na
    PROCEEDINGS OF THE 12TH INTERNATIONAL CONFERENCE ON INSPECTION APPRAISAL REPAIRS AND MAINTENANCE OF STRUCTURES, VOLS 1 AND 2, 2010, : 1059 - +
  • [47] CABLE-STAYED BRIDGE CROSSES THE MISSISSIPPI
    不详
    WELDING DESIGN & FABRICATION, 1984, 57 (06): : 67 - 70
  • [48] Disproportionate collapse of a cable-stayed bridge
    Domaneschi, Marco
    Cimellaro, Gian Paolo
    Scutiero, Gianluca
    PROCEEDINGS OF THE INSTITUTION OF CIVIL ENGINEERS-BRIDGE ENGINEERING, 2019, 172 (01) : 13 - 26
  • [49] Modal Analysis of a Cable-stayed Bridge
    Wei, Liuchuang
    Cheng, Heming
    Li, Jianyun
    INTERNATIONAL CONFERENCE ON ADVANCES IN COMPUTATIONAL MODELING AND SIMULATION, 2012, 31 : 481 - 486
  • [50] Basarab Cable-Stayed Bridge in Bucharest
    Manterola Armisen, Javier
    Martinez Cutillas, Antonio
    Fuente Garcia, Silvia
    STRUCTURAL ENGINEERING INTERNATIONAL, 2014, 24 (03) : 392 - 395