High-Speed Train Network Routing with Column Generation

被引:6
|
作者
Li, Yihua [1 ]
Miao, Qing [2 ]
Wang, Xiubin Bruce [2 ]
机构
[1] United Airlines, Chicago, IL 60606 USA
[2] Texas A&M Univ, Dwight Look Coll Engn, Zachry Dept Civil Engn, College Stn, TX 77843 USA
关键词
FLEET ASSIGNMENT; CAR ASSIGNMENT; ROLLING STOCK; OPTIMIZATION; CIRCULATION; FLIGHT; MODEL;
D O I
10.3141/2466-07
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
This paper is based on an award-winning rail scheduling project. It examines a high-speed train routing problem in which the trains are operated on a large network with sparse stations. The relatively long distance between train stations makes it unlikely to get a backup train unit in time when an operating train is out of service because of the need for maintenance. Therefore, regular maintenance is carefully incorporated into the base routing plan and is strictly enforced. An integrated path-based routing model is proposed here to design train routes and scheduling optimally. The objective is to cover the published trains and timetable with the least cost without violating operational rules and maintenance requirements. The scheduling for each operational cycle needs to be completed in a timely manner and be implementable in practice. A heuristic is proposed to solve the problem in a column generation framework. Numerical tests are conducted with operational data from the French National Railways. The test not only shows a significant cost savings but also indicates its efficiency in real-world applications.
引用
收藏
页码:58 / 67
页数:10
相关论文
共 50 条
  • [31] On the environmental performance of a high-speed train
    Andersson, E.
    Carlsson, U.
    Lukaszewicz, P.
    Leth, S.
    INTERNATIONAL JOURNAL OF RAIL TRANSPORTATION, 2014, 2 (01) : 59 - 66
  • [32] Study on complexities in relational network of component maintenance for high-speed train in network perspective
    Zong, Gang
    Zhang, Chao
    Liu, Wenzhi
    Zhongguo Tiedao Kexue/China Railway Science, 2013, 34 (03): : 105 - 108
  • [33] THE GREAT HIGH-SPEED TRAIN RACE
    STANSELL, J
    NEW SCIENTIST, 1981, 91 (1271) : 710 - 713
  • [34] Review of High-Speed Train Maintenance
    Fu, Zhenliang
    Wang, Guiguo
    Gao, Feng
    Tian, Xueyan
    Li, Yonghua
    Lu, Bihong
    2012 INTERNATIONAL CONFERENCE ON QUALITY, RELIABILITY, RISK, MAINTENANCE, AND SAFETY ENGINEERING (ICQR2MSE), 2012, : 419 - 422
  • [35] The slipstream and wake of a high-speed train
    Baker, CJ
    Dalley, SJ
    Johnson, T
    Quinn, A
    Wright, NG
    PROCEEDINGS OF THE INSTITUTION OF MECHANICAL ENGINEERS PART F-JOURNAL OF RAIL AND RAPID TRANSIT, 2001, 215 (02) : 83 - 99
  • [36] Column Generation algorithm for High-speed railway seat inventory control
    Huang Yuan
    Song He
    Tian Lixia
    ADVANCED CONSTRUCTION TECHNOLOGIES, 2014, 919-921 : 1055 - +
  • [37] Noise assessment in a high-speed train
    Parizet, E
    Hamzaoui, N
    Jacquemoud, J
    APPLIED ACOUSTICS, 2002, 63 (10) : 1109 - 1124
  • [38] Dynamic analysis of a high-speed train
    Leva, Sonia
    Paolo, Adriano Morando
    Colombaioni, Paolo
    IEEE TRANSACTIONS ON VEHICULAR TECHNOLOGY, 2008, 57 (01) : 107 - 119
  • [39] An Analysis of Cultural Factors in High-speed Train Design Taking Virgin Pendolino High-speed Train as an Example
    Liu, Xiaolu
    FRONTIERS OF MANUFACTURING AND DESIGN SCIENCE, PTS 1-4, 2011, 44-47 : 1862 - 1866
  • [40] Selection Process of IT Applications for the Korean Next-Generation High-Speed Train
    Chang, Duk-Jin
    Song, Dahl-Ho
    2009 INTERNATIONAL CONFERENCE ON NEW TRENDS IN INFORMATION AND SERVICE SCIENCE (NISS 2009), VOLS 1 AND 2, 2009, : 170 - 175