Scheduling and Analysis of Start-Up Transient Processes for Dual-Arm Cluster Tools With Wafer Revisiting

被引:29
|
作者
Pan, Chun Rong [1 ]
Qiao, Yan [2 ]
Zhou, Meng Chu [3 ,4 ]
Wu, Nai Qi [5 ,6 ]
机构
[1] Jiangxi Univ Sci & Technol, Sch Mech & Elect Engn, Ganzhou 341000, Peoples R China
[2] Guangdong Univ Technol, Dept Ind Engn, Sch Electromech Engn, Guangzhou 510006, Guangdong, Peoples R China
[3] New Jersey Inst Technol, Dept Elect & Comp Engn, Newark, NJ 07102 USA
[4] King Abdulaziz Univ, Dept Elect & Comp Engn, Jeddah 21413, Saudi Arabia
[5] Macau Univ Sci & Technol, Inst Syst Engn, Macau 999078, Peoples R China
[6] Guangdong Univ Technol, Dept Ind Engn, Guangzhou 510006, Guangdong, Peoples R China
关键词
Semiconductor manufacturing; transient process scheduling; revising process; cluster tools; RESIDENCY TIME CONSTRAINTS; STEADY-STATE THROUGHPUT; PETRI NETS; MULTICLUSTER TOOLS; MANUFACTURING SYSTEMS; PERFORMANCE;
D O I
10.1109/TSM.2015.2390644
中图分类号
T [工业技术];
学科分类号
08 ;
摘要
The trends of increasing wafer diameter and smaller lot sizes have led to more transient periods in wafer fabrication. For some wafer fabrication processes, such as atomic layer deposition, wafers need to visit some process modules for a number of times, instead of once, thus leading to a so-called revisiting process. Most previous studies on cluster tool scheduling focus on steady state at which cluster tools repeat identical cycles. Research on transient processes of dual-arm cluster tools with wafer revisiting processes becomes urgently needed for high-performance wafer fabrication. In order to speed up start-up transient processes, this paper adopts a program evaluation and review technique for the analysis of start-up transient processes and develops optimization algorithms for their scheduling of dual-arm cluster tools. Then, their complexity is analyzed. Finally, illustrative examples are given to show the applications of the proposed method.
引用
收藏
页码:160 / 170
页数:11
相关论文
共 50 条
  • [41] Petri net-based scheduling of time constrained single-arm cluster tools with wafer revisiting
    Liu, ZiCheng
    Wu, NaiQi
    Yang, FaJun
    ADVANCES IN MECHANICAL ENGINEERING, 2016, 8 (05) : 1 - 13
  • [42] Periodic Scheduling Optimization for Dual-Arm Cluster Tools with Arm Task and Residency Time Constraints via Petri Net Model
    Gu, Lei
    Wu, Naiqi
    Li, Tan
    Zhang, Siwei
    Wu, Wenyu
    MATHEMATICS, 2024, 12 (18)
  • [43] TRANSIENT PROCESSES IN THE START-UP PERIOD OF BOILERS WITH NATURAL CIRCULATION
    REMENYI, K
    MEGALLA, K
    ENERGIA ES ATOMTECHNIKA, 1981, 34 (11): : 495 - 498
  • [44] An optimal periodic scheduler for dual-arm robots in cluster tools with residency constraints
    Rostami, S
    Hamidzadeh, B
    Camporese, D
    IEEE TRANSACTIONS ON ROBOTICS AND AUTOMATION, 2001, 17 (05): : 609 - 618
  • [45] Using transient temperature analysis to evaluate steam circulation in SAGD start-up processes
    Zhu, L.
    Zeng, F.
    Zhao, G.
    Duong, A.
    JOURNAL OF PETROLEUM SCIENCE AND ENGINEERING, 2012, 100 : 131 - 145
  • [46] (Digital twin) Wafer sojourn time fluctuation analysis for time-constrained dual-arm multi-cluster tools with activity time variation
    Yang, Fajun
    Wu, Naiqi
    Qiao, Yan
    Su, Rong
    Zhang, Chunjiang
    INTERNATIONAL JOURNAL OF COMPUTER INTEGRATED MANUFACTURING, 2021, 34 (7-8) : 734 - 751
  • [47] Start-up transient analysis of ADS spallation target
    Chai, You-Qi
    Hu, Li-Qin
    Jin, Ming
    Chen, Zhi-Bin
    Wu, Yi-Can
    Yuanzineng Kexue Jishu/Atomic Energy Science and Technology, 2013, 47 (SUPPL.): : 630 - 635
  • [48] Scheduling dual-armed cluster tools with cleaning processes
    Kim, Heejung
    Kim, Hyun-Jung
    Lee, Jun-Ho
    Lee, Tae-Eog
    INTERNATIONAL JOURNAL OF PRODUCTION RESEARCH, 2013, 51 (12) : 3671 - 3687
  • [49] Scheduling Transient Processes for Time-Constrained Single-Arm Robotic Multi-Cluster Tools
    Zhu, QingHua
    Zhou, MengChu
    Qiao, Yan
    Wu, Naiqi
    IEEE TRANSACTIONS ON SEMICONDUCTOR MANUFACTURING, 2017, 30 (03) : 261 - 269
  • [50] ABWR START-UP TEST ANALYSIS WITH TRANSIENT CODE BISON
    Yano, Kazuki
    Hayashi, Yamato
    ICONE17, VOL 5, 2009, : 267 - 273