Research on The training effectiveness evaluation Based on XY Pumped Storage Plant

被引:0
|
作者
He, Yonggui [1 ]
Jiao, Zhifei [1 ]
机构
[1] North China Elect Power Univ, Dept Econ & Management, Baoding, Peoples R China
关键词
Training Evaluation; Fuzzy Evaluation; Kikpatrick Model;
D O I
暂无
中图分类号
TM [电工技术]; TN [电子技术、通信技术];
学科分类号
0808 ; 0809 ;
摘要
In order to enhance the core competitiveness of enterprises, The request of enterprise to the professional quality improved day by day, enhance quality of staff training has become an important part of human resource development. Corporate training assessment, not only directly related to the level of performance, but also has the vital significance to the sustainable increase of the enterprise overall human resources development and management. But at this stage, the concern of the training effect and the research of evaluation cycle is still relatively weak. According to the Kikpatrick four-level training model, using fuzzy comprehensive evaluation method, combining the personnel training requirements and actual of XY Pumped Storage Plant, the author try to build the corresponding core system of training effect, and verify the validity and operability of effect evaluation methods. It provides a scientific criteria for effective implementation of staff training effectiveness evaluation and training of relevant enterprises,
引用
收藏
页码:539 / 542
页数:4
相关论文
共 50 条
  • [21] Tianhuangping: A Pumped-Storage Power Plant
    By Dong Hong
    文化交流, 1997, (03) : 12 - 12
  • [22] Leningrad pumped-storage power plant
    Mishin N.N.
    Mishin, N.N., 1600, Springer Science and Business Media, LLC (46): : 377 - 379
  • [23] Innovations at hydroelectric plant pumped storage facilities
    Heninger, L.
    Spitzer, F.
    Elektrotechnik und Informationstechnik, 2009, 126 (12):
  • [24] Hydropower Plant Koralpe - Upgrading to a Pumped Storage Hydropower Plant
    Nackler, Karl
    WASSERWIRTSCHAFT, 2012, 102 (7-8) : 35 - 41
  • [25] Construction of the new Forbach pumped storage plant
    Stech H.-J.
    Achatz R.
    Strasser P.
    Thermann K.
    Caccavo G.
    Gommel U.
    Kamuf I.
    Geomechanik und Tunnelbau, 2022, 15 (05): : 469 - 477
  • [26] NYPA upgrades pumped-storage plant
    不详
    POWER, 2007, 151 (08) : 10 - 10
  • [27] SYNCHRONOUS STARTING OF SENECA PUMPED STORAGE PLANT
    FITZGERALD, JP
    GROSCUP, GW
    COOPER, EA
    BYERLY, RT
    WHITNEY, EC
    IEEE TRANSACTIONS ON POWER APPARATUS AND SYSTEMS, 1969, PA88 (04): : 307 - +
  • [28] Research on the Sample Training of BP Neural Network in Effectiveness Evaluation
    Shi, Yanbin
    Zhang, An
    Guo, Jian
    2007 INTERNATIONAL CONFERENCE ON WIRELESS COMMUNICATIONS, NETWORKING AND MOBILE COMPUTING, VOLS 1-15, 2007, : 6655 - +
  • [29] Development of the methodology for the evaluation of a hydro-pumped storage power plant: Swiss case study
    Iliadis, N. A.
    Gnansounou, E.
    ENERGY STRATEGY REVIEWS, 2016, 9 : 8 - 17
  • [30] The effectiveness of training evaluation
    Lee, Hsing Hsin
    Proceedings of the 11th Annual Conference of Asia Pacific Decision Sciences Institute: INNOVATION & SERVICE EXCELLENCE FOR COMPETITIVE ADVANTAGE IN THE GLOBAL ENVIRONMENT, 2006, : 530 - 532