共 50 条
- [31] Calculation of Time Required to Fill Tanks with Compressed Gas Chemical and Petroleum Engineering, 2003, 39 : 251 - 254
- [34] Flowable fill using flue gas desulfurization material INNOVATIONS IN CONTROLLED LOW-STRENGTH MATERIAL (FLOWABLE FILL), 2004, 1459 : 3 - 14
- [35] Erosion of fill structures at Bovanenkovskoe gas and condensate field Gazovaya Promyshlennost, 2002, (07): : 85 - 88
- [36] Parameters of injection fill above an underground gas generator TECHNICAL, TECHNOLOGICAL AND ECONOMIC ASPECTS OF THIN-SEAMS COAL MINING: INTERNATIONAL MINING FORUM 2007, 2007, : 89 - 95