Research on Power Grid Project Cost and Management Evaluation Method

被引:0
|
作者
Li Xiaorui [1 ]
Gu Bing [1 ]
机构
[1] Northeast Elect Power Univ, Sch Econ & Management, Jilin 132012, Jilin, Peoples R China
关键词
Bolted cable connector; Loose fault; Structural element;
D O I
10.1109/ICMTMA52658.2021.00195
中图分类号
TP [自动化技术、计算机技术];
学科分类号
0812 ;
摘要
In view of the problem that the cable joint looseness or other mechanical abnormalities in the high-voltage distribution cabinet is difficult to predict in time, through this project, the corresponding relationship between the comprehensive information sensing data in the high-voltage distribution cabinet and the mechanical strength weakening of the cable joint is studied, and the early warning method of joint looseness is established to improve the operation reliability of the distribution cableIn order to deeply study the characteristics of loose electrical connection fault of bolted cable and realize effective fault identification, taking bolted cable joint as the research object, the loose fault test under different loose degree and different current conditions was carried out by using cable joint loosening fault test platform. Based on the principle of fuzzy structural element, according to the influence factors of current, power factor and vibration state of cable joint, the structural element expression of fuzzy comprehensive evaluation is given, and the loose fault of bolted cable joint is comprehensively evaluated. The results show that the method can effectively identify the loose state of bolted cable joint, and provide theoretical basis for detection and protection of loose fault.
引用
收藏
页码:854 / 857
页数:4
相关论文
共 50 条
  • [21] Grid Project Cost Control Research Based on Data Mining
    Peng, Yan
    Ding, Yang
    Yu, Yuanmei
    PROCEEDINGS OF THE 2016 INTERNATIONAL CONFERENCE ON ADVANCED MATERIALS SCIENCE AND ENVIRONMENTAL ENGINEERING, 2016, 52 : 287 - 290
  • [22] Research on the Integrated Application of 3D Design and Project Cost based on Digital Power Grid
    Zhang, Hengwu
    Yan, Kehui
    Ma, Xiaofeng
    Li, Jinming
    Fang, Peng
    2020 ASIA CONFERENCE ON GEOLOGICAL RESEARCH AND ENVIRONMENTAL TECHNOLOGY, 2021, 632
  • [23] Project Monitoring and Evaluation: An Enhancing Method for Health Research System Management
    Djalalinia, Shirin
    Owlia, Parviz
    Malekafzali, Hossein
    Ghanei, Mostafa
    Babamahmoodi, Abdolreza
    Peykari, Niloofar
    INTERNATIONAL JOURNAL OF PREVENTIVE MEDICINE, 2014, 5 (04) : 505 - 510
  • [24] Management Research on the Construction Enterprise Project Cost
    Zhang, Hai Yan
    Zhao, Jin Wei
    ARCHITECTURE, BUILDING MATERIALS AND ENGINEERING MANAGEMENT, PTS 1-4, 2013, 357-360 : 2193 - +
  • [25] Construction project cost information management research
    Wen, Zhen
    ADVANCED CONSTRUCTION TECHNOLOGIES, 2014, 919-921 : 1433 - 1436
  • [26] Cost Control research in Construction Project Management
    Wang, Danjing
    2013 3RD INTERNATIONAL CONFERENCE ON EDUCATION AND EDUCATION MANAGEMENT (EEM 2013), 2013, 25 : 439 - 443
  • [27] Power Grid Crises Management and Research on Load-Model of Power Grid
    Li Shi-Hua
    Tang De-Shan
    2009 ASIA-PACIFIC POWER AND ENERGY ENGINEERING CONFERENCE (APPEEC), VOLS 1-7, 2009, : 1135 - +
  • [28] Research of an evaluation method of photovoltaic output and generated energy connected with a power grid
    Iga, A
    Kaneko, T
    Ishihara, Y
    IEEE/PES TRANSMISSION AND DISTRIBUTION CONFERENCE AND EXHIBITION 2002: ASIA PACIFIC, VOLS 1-3, CONFERENCE PROCEEDINGS: NEW WAVE OF T&D TECHNOLOGY FROM ASIA PACIFIC, 2002, : 1641 - 1646
  • [29] A Method Allocating Operation and Maintenance Cost of Power Grid Project Based on Transmission and Distribution Price Reform
    Wang Y.
    Wang X.
    Wang S.
    Yu H.
    Zhang F.
    Li R.
    Dianwang Jishu/Power System Technology, 2020, 44 (01): : 332 - 339
  • [30] Research on applications of the earned value management in the project cost management
    An, Yuhua
    Liu, Liqun
    Proceedings of 2007 International Conference on Construction & Real Estate Management, Vols 1 and 2, 2007, : 973 - 978