Continuous Reservoir-Simulation-Model Updating and Forecasting Improves Uncertainty Quantification

被引:4
|
作者
Liu, Chang [1 ]
McVay, Duane A. [1 ]
机构
[1] Texas A&M Univ, SPE, Dept Petr Engn, College Stn, TX 77843 USA
关键词
KALMAN FILTER;
D O I
10.2118/119197-PA
中图分类号
TE [石油、天然气工业]; TK [能源与动力工程];
学科分类号
0807 ; 0820 ;
摘要
Most reservoir-simulation studies are conducted in a static context at a single point in time using a fixed set of historical data for history matching Time and budget constraints usually result in significant reduction in the number of uncertain parameters and incomplete exploration of the parameter space. which results in underestimation of forecast uncertainty and less-than-optimal decision making Markov Chain Monte Carlo (MCMC) methods have been used in static studies for rigorous exploration of the parameter space for quantification of forecast uncertainty, but these methods suffer from long burn-in times and many required runs for chain stabilization In this paper, we apply the MCMC in a real-time reservoir-modeling application The system operates in a continuous process of data acquisition, model calibration. forecasting. and uncertainty quantification The system was validated on the PUNQ (production forecasting with uncertainty quantification) synthetic reservoir in a simulated multiyear continuous-modeling scenario, and it yielded probabilistic forecasts that narrowed with time Once the continuous MCMC simulation process has been established sufficiently, the continuous approach usually allows generation of a reasonable probabilistic forecast at a particular point in time with many fewer models than the traditional application of the MCMC method in a one-time. static simulation study starting at the same time Operating continuously over the many years of typical reservoir life, many more realizations can be run than with traditional approaches This allows more-thorough investigation of the parameter space and more-complete quantification of forecast uncertainty More importantly. the approach provides a mechanism for, and can thus encourage. calibration of uncertainty estimates over time Greater investigation of the uncertain parameter space and calibration of uncertainty estimates by using a continuous modeling process should improve the reliability of probabilistic forecasts significantly
引用
收藏
页码:626 / 637
页数:12
相关论文
共 50 条
  • [41] Multi-agent simulation model updating and forecasting for the evaluation of COVID-19 transmission
    Brenno Moura Castro
    Marcelo de Miranda Reis
    Ronaldo Moreira Salles
    Scientific Reports, 12 (1)
  • [42] Multi-agent simulation model updating and forecasting for the evaluation of COVID-19 transmission
    Castro, Brenno Moura
    Reis, Marcelo de Miranda
    Salles, Ronaldo Moreira
    SCIENTIFIC REPORTS, 2022, 12 (01):
  • [43] Quantification of model-form and predictive uncertainty for multi-physics simulation
    Riley, Matthew E.
    Grandhi, Ramana V.
    COMPUTERS & STRUCTURES, 2011, 89 (11-12) : 1206 - 1213
  • [44] Bayesian Inference of Cavitation Model Coefficients and Uncertainty Quantification of a Venturi Flow Simulation
    Bae, Jae-Hyeon
    Chang, Kyoungsik
    Lee, Gong-Hee
    Kim, Byeong-Cheon
    ENERGIES, 2022, 15 (12)
  • [45] Cell-level deep learning as proxy model for reservoir simulation and production forecasting
    Magalhaes, Rafael M.
    Machado, Thiago J.
    Santos, Moises D.
    Oliveira, Gustavo P.
    JOURNAL OF PETROLEUM EXPLORATION AND PRODUCTION TECHNOLOGY, 2025, 15 (02)
  • [46] IMPLEMENTING MONTE CARLO SIMULATION MODEL FOR REVENUE FORECASTING UNDER THE IMPACT OF RISK AND UNCERTAINTY
    Hussain, Zahid
    MANAGEMENT AND PRODUCTION ENGINEERING REVIEW, 2019, 10 (04) : 81 - 89
  • [47] Simulation study of the effects of model uncertainty in variational assimilation of radar data on rainfall forecasting
    Grecu, M
    Krajewski, WF
    JOURNAL OF HYDROLOGY, 2000, 239 (1-4) : 85 - 96
  • [48] A micro-simulation model system of departure time using a perception updating model under travel time uncertainty
    Ettema, D
    Tamminga, G
    Timmermans, H
    Arentze, T
    TRANSPORTATION RESEARCH PART A-POLICY AND PRACTICE, 2005, 39 (04) : 325 - 344
  • [49] Quantification of model uncertainty and variability for landslide displacement prediction based on Monte Carlo simulation
    Wang, Luqi
    Xiao, Ting
    Liu, Songlin
    Zhang, Wengang
    Yang, Beibei
    Chen, Lichuan
    GONDWANA RESEARCH, 2023, 123 : 27 - 40
  • [50] Bayesian uncertainty quantification analysis of the SST model for transonic flow around airfoils simulation
    Li, Yao
    Li, Jin-ping
    Zeng, Fan-zhi
    Sun, Mao
    Yan, Chao
    AEROSPACE SCIENCE AND TECHNOLOGY, 2023, 137