共 30 条
- [23] Evaluation of the Interferences in the Interconnection Point between 2x25kVAC High-Speed Railway Lines and 3kVDC Regional System 2009 10TH INTERNATIONAL CONFERENCE ON ELECTRICAL POWER QUALITY AND UTILISATION (EPQU 2009), 2009, : 245 - +
- [24] Performance and mathematical model of three-phase three-winding transformer used in 2 x 25 kV electric railway IEE PROCEEDINGS-ELECTRIC POWER APPLICATIONS, 2006, 153 (02): : 271 - 281
- [26] Turin-Milan high-speed railway-line, 2x25 kV 50 HZ AC electrified. EMC problems in earthing of exposed conductive parts. 2006 INTERNATIONAL SYMPOSIUM ON POWER ELECTRONICS, ELECTRICAL DRIVES, AUTOMATION AND MOTION, VOLS 1-3, 2006, : 1127 - 1132
- [27] Measurement and Evaluation of Voltage Unbalance in 2 x 25 kV 50 Hz High-Speed Trains Using Variable Integration Period ELECTRICITY, 2024, 5 (01): : 154 - 173
- [28] Transient Overvoltage Analysis of Traction Power Supply System with Neutral Sections in China High-Speed Railway Using a State-Space Model PROCEEDINGS OF THE 3RD INTERNATIONAL CONFERENCE ON ELECTRICAL AND INFORMATION TECHNOLOGIES FOR RAIL TRANSPORTATION (EITRT) 2017: TRANSPORTATION, 2018, 483 : 1 - 14
- [29] Fault Analysis of the Gautrain 2 x 25 kV AC Traction Power Supply System Using Disturbance Fault Records and On-Site Testing IEEE SYSTEMS JOURNAL, 2021, 15 (04): : 5704 - 5713
- [30] Solution to reduction of potential difference on both ends of insulation joint based on simulation model of traction power supply system in typical station of high speed railway Zhongguo Tiedao Kexue/China Railway Science, 2016, 37 (02): : 70 - 77