Evaluating Water Transfer Projects Using Analytic Network Process (ANP)

被引:37
|
作者
Toosi, S. L. Razavi [1 ]
Samani, J. M. V. [1 ]
机构
[1] Tarbiat Modares Univ, Dept Water Struct, Tehran, Iran
关键词
Ranking; Water transfer projects; Analytic Network Process (ANP); MULTICRITERIA EVALUATION; DECISION-MAKING; SELECTION;
D O I
10.1007/s11269-012-9995-2
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
This article introduces the analytic network process (ANP) as an effective tool for ranking water transfer projects. Water resources are the main basis of stable development around the world. Uneven water distribution and the shortage of water in some areas have caused water managers to consider interbasin water transfer as a solution to these water problems. Due to the many different conflict criteria in ranking water projects, ranking execution projects is one of the most critical and difficult tasks in water management. Multiple Attribute Decision Making (MADM) is a collection of methodologies to compare, select, or rank multiple alternatives that typically involve incommensurate attributes. Many decision problems cannot be structured hierarchically because they involve the interaction and dependence of higher-level elements in a hierarchy on lower-level ones. This study deals with ranking water transfer projects as a MADM problem. Due to the fact that many of the criteria are related to each other, the Analytic Network Process (ANP) is proposed for ranking projects. Ten water transfer projects in Karun River are investigated. Thirty influential factors are identified. They are classified under benefit, cost and risk criteria. The objective of this investigation is ranking alternatives with respect to different criteria in network form. Finally, sensitivity analysis is introduced.
引用
收藏
页码:1999 / 2014
页数:16
相关论文
共 50 条
  • [21] Using analytic network process for evaluating mobile text entry methods
    Ocampo, Lanndon A.
    Seva, Rosemary R.
    APPLIED ERGONOMICS, 2016, 52 : 232 - 241
  • [22] Evaluating Smart Living Technology Strategies Using the Analytic Network Process
    Shieh, Lon-Fon
    Yeh, Ching-Chiang
    Lai, Ming-Cheng
    JOURNAL OF TESTING AND EVALUATION, 2013, 41 (06) : 1011 - 1023
  • [23] Multi-criteria inventory classification by using a fuzzy Analytic Network Process (ANP) approach
    Kiriş, S. (safak.kiris@dpu.edu.tr), 1600, IOS Press BV (24):
  • [24] OPTIMAL SELECTION OF PROGRAM SUPPLIERS FOR TV COMPANIES USING AN ANALYTIC NETWORK PROCESS (ANP) APPROACH
    Liao, Sen-Kuei
    Chang, Kuei-Lun
    Tseng, Tzeng-Wei
    ASIA-PACIFIC JOURNAL OF OPERATIONAL RESEARCH, 2010, 27 (06) : 753 - 767
  • [25] Using the analytic network process (ANP) to determine method of waste energy recovery from engine
    Liang, Xingyu
    Sun, Xiuxiu
    Shu, Gequn
    Sun, Kang
    Wang, Xu
    Wang, Xinlei
    ENERGY CONVERSION AND MANAGEMENT, 2013, 66 : 304 - 311
  • [26] Multi-Criteria Inventory Classification by Using a Fuzzy Analytic Network Process (ANP) Approach
    Kiris, Safak
    INFORMATICA, 2013, 24 (02) : 199 - 217
  • [27] Refuse Derived Fuel (RDF) Utilization in Cement Industry by Using Analytic Network Process (ANP)
    Ozkan, Aysun
    Banar, Mufide
    PRES 2010: 13TH INTERNATIONAL CONFERENCE ON PROCESS INTEGRATION, MODELLING AND OPTIMISATION FOR ENERGY SAVING AND POLLUTION REDUCTION, 2010, 21 : 769 - 774
  • [28] Selection of logistics service provider: An analytic network process (ANP) approach
    Jharkharia, Sanjay
    Shankar, Ravi
    OMEGA-INTERNATIONAL JOURNAL OF MANAGEMENT SCIENCE, 2007, 35 (03): : 274 - 289
  • [29] The Selection of Ocean Container Carrier: An Analytic Network Process (ANP) Approach
    Ergin, Ayfer
    Alkan, Guler
    JOURNAL OF ETA MARITIME SCIENCE, 2023, 11 (03) : 159 - 167
  • [30] An AHP (Analytic Hierarchy Process)/ANP (Analytic Network Process)-based multi-criteria decision approach for the selection of solar-thermal power plant investment projects
    Aragones-Beltran, Pablo
    Chaparro-Gonzalez, Fidel
    Pastor-Ferrando, Juan-Pascual
    Pla-Rubio, Andrea
    ENERGY, 2014, 66 : 222 - 238