Benefit Evaluation of Implementing BIM in Construction Projects

被引:2
|
作者
Chou, Hui-Yu [1 ]
Chen, Pei-Yu [2 ]
机构
[1] 168 Jifeng E Rd, Taichung 41349, Taiwan
[2] 3-1,Ln 5,Zhuhe Rd, Taichung 421, Taiwan
关键词
D O I
10.1088/1757-899X/245/6/062049
中图分类号
TU [建筑科学];
学科分类号
0813 ;
摘要
Since 2014, public construction projects in Taiwan have progressively undertaken steps to promote the use of Building Information Modelling (BIM) technology, the use of BIM has therefore become a necessity for contractors. However, issues such as the high upfront costs relating to software and hardware setup and BIM user training, combined with the difficulties of incorporating BIM into existing workflow operations and management systems, remain a challenge to contractors. Consequently, the benefits stemming from the BIM implementation in turn will affect the activeness and enthusiasm of contractors to implement BIM. While there have been previous studies abroad where the benefits relating to BIM implementation had been calculated and quantified numerically, a benefit evaluation index would require considerations for regional industry practices and characteristics. This study established a benefit evaluation index and method for the implementation of BIM suitable for contractors in Taiwan. The three main principal indexes are: (1) RCR means the effects of reducing costs associated with rework; (2) SDR & DPR mean the effects of mitigating delays that occur due to construction interface coordination or rework, as well as the effects of reducing the penalty costs associated with overdue delivery; (3) AQE means the effects of improving the ability to estimate the amounts of building materials and resources. This study also performed a benefit evaluation calculation of a real world case study construction project using the first two established indexes. The results showed a 0.16% reduction in rework costs, a 6.49% reduction in delays that occur from construction interface coordination or rework, and a 5.0% reduction in penalty costs associated with overdue deliveries. The results demonstrated the applicability of the benefit evaluation index established in this study for real world construction projects.
引用
收藏
页数:8
相关论文
共 50 条
  • [41] Value Analysis in Construction Projects with BIM implementation: A Systematic Review
    Altaf, Muhammad
    Alaloul, Wesam Salah
    Khan, Sheharyar
    Liew, M. S.
    Musarat, Muhammad Ali
    Mohsen, Alawag Aawag
    2021 INTERNATIONAL CONFERENCE ON DECISION AID SCIENCES AND APPLICATION (DASA), 2021,
  • [42] A Study of the Potential of Cloud/Mobile BIM for the Management of Construction Projects
    Abanda, F. H.
    Mzyece, D.
    Oti, A. H.
    Manjia, M. B.
    APPLIED SYSTEM INNOVATION, 2018, 1 (02) : 1 - 19
  • [43] Developing Standard BIM Execution Plans for Complex Construction Projects
    Abdelalim, Ahmed Mohammed
    Shawky, Kamal
    Alnaser, Aljawharah A.
    Shibeika, Amna
    Sherif, Alaa
    APPLIED SCIENCES-BASEL, 2024, 14 (15):
  • [44] BIM Application in the Whole Life Cycle of Construction Projects in China
    Luo, Lan
    Yan, Zhixin
    Yang, Delei
    Xie, Jianxun
    Wu, Guangdong
    CONSTRUCTION RESEARCH CONGRESS 2018: SUSTAINABLE DESIGN AND CONSTRUCTION AND EDUCATION, 2018, : 189 - 197
  • [45] Challenges in construction readiness for BIM-based building projects
    Radzi, Afiqah R.
    Azmi, Nur Farhana
    Kamaruzzaman, Syahrul Nizam
    Algahtany, Mohammed
    Rahman, Rahimi A.
    JOURNAL OF ASIAN ARCHITECTURE AND BUILDING ENGINEERING, 2024,
  • [46] State of the art of the use of BIM for resolution of claims in construction projects
    Araya, F.
    REVISTA INGENIERIA DE CONSTRUCCION, 2019, 34 (03): : 299 - 306
  • [47] Digitizing material passport for sustainable construction projects using BIM
    Atta, Islam
    Bakhoum, Emad S.
    Marzouk, Mohamed M.
    JOURNAL OF BUILDING ENGINEERING, 2021, 43
  • [48] DIGITAL QUALITY MANAGEMENT IN CONSTRUCTION INDUSTRY WITHIN BIM PROJECTS
    Stransky, Martin
    Matejka, Petr
    18TH INTERNATIONAL SCIENTIFIC CONFERENCE ENGINEERING FOR RURAL DEVELOPMENT, 2019, : 1707 - 1718
  • [49] Mapping BIM Uses for Risk Mitigation in International Construction Projects
    Ganbat, Tsenguun
    Chong, Heap-Yih
    Liao, Pin-Chao
    ADVANCES IN CIVIL ENGINEERING, 2020, 2020
  • [50] Optimal BIM staffing in construction projects using a queueing model
    Ham, Namhyuk
    Moon, Sungkon
    Kim, Ju-Hyung
    Kim, Jae-Jun
    AUTOMATION IN CONSTRUCTION, 2020, 113