共 45 条
Bulk ore sorting cut-off estimation methodology: Phu Kham Mine case study
被引:7
|作者:
Reple, A.
[1
,2
]
Chieregati, A. C.
[1
]
Valery, W.
[3
,4
]
Prati, F.
[2
]
机构:
[1] Univ Sao Paulo, Av Prof Mello Moraes 2373, Sao Paulo, SP, Brazil
[2] Consultoria Mineracao & Meio Ambiente Ltda, Kalium Consultoria, Rua Purpurina,131 Cj 138, Sao Paulo, SP, Brazil
[3] Hatch, 61 Petrie Tce, Brisbane, Qld 4000, Australia
[4] Univ Queensland, St Lucia, Qld 4072, Australia
关键词:
Bulk ore sorting;
Cut-off grade;
Phu Kham Mine;
Copper;
Geostatistics;
D O I:
10.1016/j.mineng.2018.08.006
中图分类号:
TQ [化学工业];
学科分类号:
0817 ;
摘要:
As part of the evolution of ore sorting technology for large-scale production operations, Bulk Ore Sorting (BOS) is applied to projects that mine tens of millions of tons per year. BOS systems aim to remove as much non-economic material as possible prior to milling. Mass recovery, metallurgical recovery and consequently plant throughput fluctuate according to deposit characteristics, mining method, equipment efficiency and the cut-off grade applied at both the mine and BOS stage. This case study presents a calculation methodology which determines cut-off grade combinations for the mine and BOS to maximize the financial return for both brownfield and greenfield projects. From this information it is possible to calculate the mass balance, including the BOS stage, in a new process flow sheet. The assumptions made, and production data used (such as volumes, costs and grades) for this case study were those realized in 2014 by Phu Kham Mining, a world-class copper and gold operation situated in Laos.
引用
收藏
页数:4
相关论文